Loading...
HomeMy WebLinkAbout792-792-193 (2)58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:9/2/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 8/19/2026 Time Cast: 8:20 AM Date Received: 8/21/2026 Placement Location:SBR SLABS 43, 52, 60, 65 Placement Method:PUMP Cylinders Made By:Riley Nordahl Material Type:Concrete Cylinders Placement Vol. (yd ):285 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F): 65 Maximum (°F): 80 Admixtures:SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):6 1/2 Air Content (%) (C-231):5 Air Temp (°F):70 Conc. Temp (°F) (C-1064):81 Load Number:10 Mixer Num.:55 Ticket Num.:53422 Cubic Yards:110 Design (psi):4500 Batch 8:00 AM Arrive 8:10 AM Depart 8:20 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-193A N 29.3 6 28.27 8/26/2026 Lab Unbonded 7 5 159.11 5630 792-193B N 29.25 6.02 28.46 9/2/2026 Lab Unbonded 14 5 180.42 6340 792-193C 29.15 9/16/2026 Lab 28 792-193D 29.3 9/16/2026 Lab 28 792-193E 29.2 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By