Loading...
HomeMy WebLinkAbout792-792-192 (1)58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:9/2/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 8/19/2026 Time Cast: 7:05 AM Date Received: 8/21/2026 Placement Location:SBR SLABS 43, 52, 60, 65 Placement Method:PUMP Cylinders Made By:Riley Nordahl Material Type:Concrete Cylinders Placement Vol. (yd ):285 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F): 65 Maximum (°F): 80 Admixtures:SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):6 1/2 Air Content (%) (C-231):4.25 Air Temp (°F):66 Conc. Temp (°F) (C-1064):74 Load Number:2 Mixer Num.:75 Ticket Num.:53417 Cubic Yards:11 Design (psi):4500 Batch 6:10 AM Arrive 6:50 AM Depart 7:00 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-192A N 29.1 6 28.27 8/26/2026 Lab Unbonded 7 5 120.12 4250 792-192B N 28.9 6.06 28.89 9/2/2026 Lab Unbonded 14 5 163.29 5660 792-192C 28.9 9/16/2026 Lab 28 792-192D 28.85 9/16/2026 Lab 28 792-192E 29 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By