Loading...
HomeMy WebLinkAboutNarrative 8.28.2026Project Narrative Proposed Mixed -Use Redevelopment August 28, 2026 9645 Main Street & #14 Appleby Road, West Yarmouth, MA 1.0 Project Introduction The project owner and applicant, Bayridge Realty, LLC, proposes the redevelopment of the properties at #645 Main Street (Route 28) & #14 Appleby Road, West Yarmouth (Yarmouth), MA. The proposal herein provides the design and detail information, as well as provides how the project will serve the interests of the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131, § 40), the implementing state regulations (310 CMR 10.00), and the Town of Yarmouth Wetlands Protection Bylaw (Chapter 143). 2.0 Existing Site Conditions Existing Conditions, Geographical Setting, and Wetland Resource Arens The project locus is comprised of two parcels. #645 Main Street (Route 28) (Map 32 Parcel 136) is approximately 27,596 sf (0.64 acres) and #14 Appleby Road is approximately 13,054 sf (0.30 acres). The combined area of the two parcels is 40,859 sf (0.94 acres). The properties are currently served by a 2-story commercial structure and an asphalt parking lot. The accompanying plans in Attachment 1, "Proposed Site Plans — Mixed Use Redevelopment" by Baxter Nye Engineering & Surveying, revised August 7, 2026 provide the location of the jurisdictional WRA along with the proposed project area. The property includes the Wetland Resource Area (WRA) of Land Subject to Coastal Storm Flowage (LSCSF). The site locus figures provided in Attachment 2 provide additional graphic information which should be reviewed concurrently with the following existing conditions descriptions. Land Subject to Coastal Storm Flowage (LSCSF) By regulation 310 CMR 10.04, Land Subject to Coastal Storm Flowage (LSCSF) is defined as "land subject to any inundation caused by coastal storms up to and including that caused by the 100 year storm, surge of record or storm of record, whichever is greater." There is no buffer zone associated with LSCSF. Both properties, in the entirety, are located in Flood Zone AE (EL. 11) on FEMA Flood Insurance Rate Map 250001 0588 J, effective July 16, 2014. 3 1 P a g e BAXTER NYE ENGINEERING &. SURVEYING 1597 Falmouth Road — Suite 1, Centerville, MA 02632 Tel: 508-771-7502 ■ info baxter-n e.com ■ www.baxter-nye.com Project Narrative August 28, 2026 3.0 Proposed Project Activities Proposed Work Proposed Mixed -Use Redevelopment #645 Main Street & #14 Appleby Road, West Yarmouth, MA As described in the summary of this narrative, the proposed project consists of demolition of the existing 2-story structure and existing parking lot, and the construction of a two -story missed -use building and parking lot. Approximately 34,912 sf of LSCSF will be disturbed. The proposed structure will have 2 commercial units and 11 multi -family units. Town sewer and water will be connected to the structure. The finished floor elevation of the renovated structure will be 13.50', 2.50' above the 100-year flood elevation (AE El. 11). Impacted WRAs As stated above, the entire property is within the LSCSF. The proposed project will impact approximately 34,912 sf) of LSCSF. No buffers are associated with the LSCSF. All disturbed areas will be stabilized through vegetation or structures upon the project's completion. Mitigation No mitigation plantings are required for impact to the LSCSF per the Town of Yarmouth Wetlands Protection Bylaw (Chapter 143). 4.0 Regulatory Compliance Land Subject to Coastal Storm Flowage (LSCSF) The WRA within the proposed project area is the LSCSF. As the existing landscape contours will only be minimally modified, and a vegetated buffer between the subject properties and the abutting properties will be maintained, and all the proposed roof runoff will be directed to leaching structures, BN believes that the proposed project will not adversely impact the ability of the flood zone to absorb or dampen wave impacts, will not reduce the ability of the flood zone to buffer more inland areas from flooding and wave damage, will not displace or divert flood water to other areas, will not cause or create the likelihood of damage by debris to other nearby structures, will not cause ground or surface pollution triggered by coastal storm flowage, and will not adversely impact areas that could be suitable for the inland migration of salt marshes. 41Pacge BAXTER NYE ENGINEERING & SURVEYING 1597 Falmouth Road Suite 1, Centerville, W 02632 Tel: 508-771-7502 ■ info a,baxter-n ey com a www.baxter-nye.com Project Narrative August 28, 2026 Proposed Mixed -Use Redevelopment #645 Main Street & #14 Appleby Road, West Yarmouth, MA BN believes the project as proposed protects the interests and meets the performance standards of 310 CMR 10.04 and Yarmouth Wetland Bylaws. Summary BN believes that the applicable wetland interests for this project have been met and that the project will serve the interests of the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131, §40), the implementing state regulations (310 CMR 10.00) and the Town of Yarmouth Wetlands Protection Bylaw (Chapter 143). BN submits that this project is eligible for an Order of Conditions approving the project construction details within the limits shown on the plan. 5[Pag-3 BAXTER NYE ENGINEERING &. SURVEYING 1597 Falmouth Road— Suite 1, Centerville, MA 02632 Tel: 508-771-7502 m info baxterr-n� z www.baxter-nye.com