Loading...
HomeMy WebLinkAboutPage 2 of Checklist signature & sealLlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report B. Stormwater Checklist and Certification The following checklist is intended to serve as a guide for applicants as to the elements that ordinarily need to be addressed in complete Stormwater Report. The checklist is also intended to provide conservation commissio I and other reviewing authorities with a summary of the components necessary for a comprehensive Sto{`mwater Report that addresses the ten Stormwater Standards. Note: Because stormwater requirements vary from project to project, it is possible that a complete Stormwater Report may not include information on some of the subjects specified in the Checklist. If it is determined that a specific item does not apply to the project under review, please note that the item is not applicable (N.A.) and provide the reasons for that determination. A complete checklist must include the Certification set forth below signed by the Registered Professional Engineer who prepared the Stormwater Report. Registered Professional Engineer's Certification have reviewed the Stormwater Report, including the soil evaluation, computations, Long-term Pollution Prevention Plan, the Construction Period Erosion and Sedimentation Control Plan (if included), the Long- term Post -Construction Operation and Maintenance Plan, the Illicit Discharge Compliance Statement (if included) and the plans showing the stormwater management system, and have determined that they have been prepared in accordance with the requirements of the Stormwater Management Standards as further elaborated by the Massachusetts Stormwater Handbook. I have also determined that the information presented in the Stormwater Checklist is accurate and that the information presented in the Stormwater Report accurately reflects conditions at the site as of the date of this permit application. Registered Professional Engineer Block and Signature OF _ 9 UATfHEW �$ �^ �y EDY CIMIL No. 43153 c �'`' �fia► 8 tEF'�� 44 14AL Sig Checklist 5"M m, __ Project Type: Is the application for new development, redevelopment, or a mix of new and redevelopment? ❑ New development ® Redevelopment ❑ Mix of New Development and Redevelopment Stormwater Report Checklist 2008-04-01.doc - 04/01/08 Stormwater Report Checklist • Page 2 of 8