HomeMy WebLinkAboutPage 2 of Checklist signature & sealLlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands Program
Checklist for Stormwater Report
B. Stormwater Checklist and Certification
The following checklist is intended to serve as a guide for applicants as to the elements that ordinarily
need to be addressed in complete Stormwater Report. The checklist is also intended to provide
conservation commissio I and other reviewing authorities with a summary of the components necessary
for a comprehensive Sto{`mwater Report that addresses the ten Stormwater Standards.
Note: Because stormwater requirements vary from project to project, it is possible that a complete
Stormwater Report may not include information on some of the subjects specified in the Checklist. If it is
determined that a specific item does not apply to the project under review, please note that the item is not
applicable (N.A.) and provide the reasons for that determination.
A complete checklist must include the Certification set forth below signed by the Registered Professional
Engineer who prepared the Stormwater Report.
Registered Professional Engineer's Certification
have reviewed the Stormwater Report, including the soil evaluation, computations, Long-term Pollution
Prevention Plan, the Construction Period Erosion and Sedimentation Control Plan (if included), the Long-
term Post -Construction Operation and Maintenance Plan, the Illicit Discharge Compliance Statement (if
included) and the plans showing the stormwater management system, and have determined that they
have been prepared in accordance with the requirements of the Stormwater Management Standards as
further elaborated by the Massachusetts Stormwater Handbook. I have also determined that the
information presented in the Stormwater Checklist is accurate and that the information presented in the
Stormwater Report accurately reflects conditions at the site as of the date of this permit application.
Registered Professional Engineer Block and Signature
OF
_ 9
UATfHEW �$
�^
�y EDY
CIMIL
No. 43153
c
�'`' �fia► 8 tEF'�� 44
14AL
Sig
Checklist
5"M m, __
Project Type: Is the application for new development, redevelopment, or a mix of new and
redevelopment?
❑ New development
® Redevelopment
❑ Mix of New Development and Redevelopment
Stormwater Report Checklist 2008-04-01.doc - 04/01/08 Stormwater Report Checklist • Page 2 of 8