Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-203
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:9/9/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 9/4/2026 Time Cast: 6:39 AM Date Received: 9/5/2026 Placement Location:3/4 SBR SLAB SHB SLAB 4, 5, 6 Placement Method:Pump Cylinders Made By:Robert Reuter Material Type:Concrete Cylinders Placement Vol. (yd ):148 Aggregate Size (in):3/4 Cylinder Size:4" x 8" INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures: TEST RESULTS Slump (in) (C-143):7 1/4 Air Content (%) (C-231):5 Air Temp (°F):68 Conc. Temp (°F) (C-1064):74 Load Number:2 Mixer Num.:65 Ticket Num.:193388 Cubic Yards:11 Design (psi):4500 Batch 5:35 AM Arrive 6:25 AM Depart 6:50 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-203A N 8.75 4.01 12.63 9/9/2026 Lab Unbonded 5 3 71.25 5640 792-203B 8.75 9/18/2026 Lab 14 792-203C 8.7 10/2/2026 Lab 28 792-203D 8.65 10/2/2026 Lab 28 792-203E 8.65 10/2/2026 Lab 28 792-203F 8.8 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By