Loading...
HomeMy WebLinkAbout792-792-189 (1)58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:9/14/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 8/17/2026 Time Cast: 7:50 AM Date Received: 8/18/2026 Placement Location:SBR WALLS ON SLABS 32, 33 Placement Method:PUMP Cylinders Made By:Riley Nordahl Material Type:Concrete Cylinders Placement Vol. (yd ):135 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):6 1/2 Air Content (%) (C-231):4 Air Temp (°F):69 Conc. Temp (°F) (C-1064):78 Load Number:2 Mixer Num.:62 Ticket Num.:36881 Cubic Yards:22 Design (psi):4500 Batch 7:30 AM Arrive 7:40 AM Depart 7:45 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-189A N 29.45 6.01 28.37 8/24/2026 Lab Unbonded 7 5 145.85 5140 792-189B N 29.65 6 28.27 8/31/2026 Lab Unbonded 14 5 172.96 6120 792-189C N 29.75 6 28.27 9/14/2026 Lab Unbonded 28 5 179.07 6330 792-189D N 29.6 6 28.27 9/14/2026 Lab Unbonded 28 5 175.59 6210 792-189E 29.6 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By