Loading...
HomeMy WebLinkAboutCOC request 9.10.2026www.wilkinsonecological.com 9/10/2026 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE: Certificate of Compliance 35 Aunt Dorah’s Lane SE 83-2242 Dear Conservation Commission Members, On behalf of the applicant, Wilkinson Ecological Design, Inc. (WED) submits this letter to request a Certificate of Compliance for the Order of Conditions SE 83-2242. The Order of Conditions was issued 8/25/2020 following an Enforcement Order issued on 11/27/2019 and revised Enforcement Order issued on 7/25/2023. The approved project consisted of marsh restoration. Currently, WED believes the project is in substantial compliance with the Order of Conditions and recommends that the Yarmouth Conservation Commission grant a Certificate of Compliance. WED requests the following ongoing conditions: 1.Wilkinson to be contractor of record unless property owner notifies the Conservation Department of a change in contractor. 2.Ongoing treatment of Phragmites as needed. Treatment will consist of targeted cut and wipe methods and will be monitored on a yearly basis. All treatment will be done by a licensed pesticide applicator. Thank you for your attention to this matter. Sincerely, Stephen Lee, Project Manager Wilkinson Ecological Design s.lee@wilkinsonecological.com 508-246-4759 wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: SE 83-2242 Provided by DEP A. Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. This request is being made by: Stephen Lee, Wilkinson Ecological Design Name 28 Lots Hollow Road Mailing Address Orleans City/Town MA State 02653 Zip Code 508-246-4759 Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Francesco D. Melandri Applicant 8/25/2020 Dated SE 83-2242 DEP File Number Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 3. The project site is located at: 35 Aunt Dorah's Lane Street Address Yarmouth City/Town 136 Assessors Map/Plat Number 56 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) Barnstable County 33349 Book 101 Page Certificate (if registered land) 5. This request is for certification that (check one): the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: SE 83-2242 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html).