Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-207
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:9/22/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 9/15/2026 Time Cast: 7:45 AM Date Received: 9/16/2026 Placement Location:STAIRCASE & BEAM & WALKWAYS & EXTERIOR WALL Placement Method:Pump Cylinders Made By:Henry Among Material Type:Concrete Cylinders Placement Vol. (yd ): Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures: TEST RESULTS Slump (in) (C-143):5 1/2 Air Content (%) (C-231):5 Air Temp (°F):72 Conc. Temp (°F) (C-1064):70 Load Number:1 Mixer Num.:60 Ticket Num.:53821 Cubic Yards:7 Design (psi):4500 Batch 7:01 AM Arrive Depart Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-207A N 29.35 6.01 28.37 9/22/2026 Lab Unbonded 7 5 135.23 4770 792-207B 29.3 9/29/2026 Lab 14 792-207C 29.3 10/13/2026 Lab 28 792-207D 29.35 10/13/2026 Lab 28 792-207E 29.35 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By