HomeMy WebLinkAboutStructural Engineer Letter 9/10/26 DWD ENGINEERING, INC.
5 MICHAEL ROAD EAST BRIDGEWATER, MA 02333
(508)378-9602
domdean@aol.com
p{ E (..
SEP 1'7 23
September 10, 2026
Mr. Mark Grylls-Building Commissioner
Yarmouth Building Department
1146 Route 28
South Yarmouth, MA 02664
RE: Post Connection-Botting Residence
91 Crowell Road-Yarmouth, MA
Dear Mr. Grylls,
It has come to my attention that the contractor provided a coil strap for the beam to post connection in lieu of the
post caps that were shown on the design drawings (reviewed and stamped by this office). After reviewing the as-built
condition it is my professional opinion that the as built condition is structurally sound and no remedial work is required.
Please feel free to contact this office if you have any questions or require further clarification.
Si it ,. *A44
e \OF MA 1'44 I" , \.J i
,�
. .r: - loe, -l\
Cc: McPhee Associates of Cape Cod
o STRUCTURRL
vo RNo.3.062Q
' FGISjEP e
9O��S./ONA' .��.
- -