Loading...
HomeMy WebLinkAboutStructural Engineer Letter 9/10/26 DWD ENGINEERING, INC. 5 MICHAEL ROAD EAST BRIDGEWATER, MA 02333 (508)378-9602 domdean@aol.com p{ E (.. SEP 1'7 23 September 10, 2026 Mr. Mark Grylls-Building Commissioner Yarmouth Building Department 1146 Route 28 South Yarmouth, MA 02664 RE: Post Connection-Botting Residence 91 Crowell Road-Yarmouth, MA Dear Mr. Grylls, It has come to my attention that the contractor provided a coil strap for the beam to post connection in lieu of the post caps that were shown on the design drawings (reviewed and stamped by this office). After reviewing the as-built condition it is my professional opinion that the as built condition is structurally sound and no remedial work is required. Please feel free to contact this office if you have any questions or require further clarification. Si it ,. *A44 e \OF MA 1'44 I" , \.J i ,� . .r: - loe, -l\ Cc: McPhee Associates of Cape Cod o STRUCTURRL vo RNo.3.062Q ' FGISjEP e 9O��S./ONA' .��. - - s .: