Administrative Checklist
Partial Certificate of Compliance
General Information:
•All filings must be made on Town of Yarmouth forms.
•All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
•Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
•Contact the Conservation Office if you need assistance.
Submitting an Application:
Hard-copy of the Partial COC application mailed to or dropped off at the conservation
Office In Town Hall.
Signed statement from an Engineer or similar professional who prepared the
approved plan stating the date of a recent site inspection and certifying partial
compliance with the permit and outlining departures from the approved plan, if any
exist.
If mitigation planting was required, include planting date and confirm the required
time has elapsed*.
As-Built plan meeting all Plan Requirements. – *Refer to the issued Order of
Conditions: Special Conditions to determine if an as-built is required*.
PDF of the Partial COC request including application, letter, and as-built plan (if
needed) emailed to bdirienzo@yarmouth.ma.us and jjerolimo@yarmouth.ma.us
Local filing fee. Refer to the Fee Schedule. Make check payable to “Town of
Yarmouth” and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
*Click Yarmouth Street Index for parcel-related Conservation documents.
CONSERVATION
OFFICE
(Plantings installed in June, 2026)
September 28, 2026
Ms. Brittany DiRienzo, Administrator
Yarmouth Conservation Commission
1146 Route 28
Yarmouth, MA 02536
RE: Request for Partial Certificate of Compliance, 22 Driftwood Lane, Yarmouth, MA - DEP SE 83-2511
Dear Chairman & member of the Yarmouth Conservation Commission:
Per request of the homeowners, Richard and Carol Dove, Cape & Islands Engineering, Inc. submits this request for a
Partial Certificate of Compliance for the work completed in accordance with the Order of Conditions, DEP File No. SE 83-
2511 issued on March 12, 2026, for Richard and Carol Dove. A Full Request for Certificate of Compliance will be
submitted once the restoration and mitigation have survived for at least two more growing seasons.
Based on a site inspection completed, the project has been substantially completed according to the plan of reference
titled, “Proposed Wall Replacement Plan, dated December 31, 2025, Revised February 25, 2026, signed and stamped by
Charles T. Rowland, P.E. along with the Existing Conditions Plan to Accompany a COC Plan dated September 8, 2026,
stamped by J. Jake Fricke, P.L.S.
We respectfully request the issuance of a Partial Certificate of Compliance for DEP SE #83-2511 at your earliest
convenience.
Thank you for your attention to this matter.
Sincerely,
Charles Rowland, P.E.
Sr. Project Manager
Encl.: Filing fee
As-Built Plan
Photos of the site
Cc: Richard and Carol Dove
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Partial Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1.This request is being made by:
Name
Mailing Address
City/Town
State
Zip Code
Phone Number
2.This request is in reference to work regulated by a final Order of Conditions issued to:
Applicant
Dated
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3.The project site is located at:
Street Address
City/Town
Assessors Map/Plat Number
Parcel/Lot Number
4.The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
County
Book
Page
Certificate (if registered land)
5.This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
SE #83-2551
Richard and Carol Dove
22 Driftwood Lane,
Yarmouth,MA 02664
508-277-0894
Richard & Carol Dove
March 12, 2026 SE #83-2511
22 Driftwood Lane Yarmouth, MA
127/55 Parcel 55
Richard and Carol Dove
BARNSTABLE 35896 302
Reconstruction of the Wall and fill is complete. The plantings were installed in June, 2026.
Need more growing seasons for Final Compliance.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
Provided by DEP
A.Project Information (cont.)
6.Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B.Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).