HomeMy WebLinkAboutCCOR 09-15-2026 792-206 to 792-207Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:9/15/2026 Client:Wright-Pierce Client Rep:RayssaWeather:Clear 60 - 75°F S.W.COLE Rep:Henry Among General Contractor:wright pierce Time Onsite:05:30 - 10:30 Placement Type: Footing  Wall  Slab  OtherPlacement Location:Process Building Staircase and Beam, upper two flights (3/4") SBR 1 walkways above Slabs 8 and 18 Exterior wall on SBR Slab 45 Concrete Placement Observations Observed Comments Required mix used Yes 4500 PSI Concrete strength and aggregate size of 3/4 "and 4500psi concrete strength with aggregate size of 1"-1/2" Concrete properly conveyed to all areas of placement Yes concrete was pumped Internal vibration / consolidation of concrete Yes vibrator was used to consolidate the concrete Even layering around openings and embedments Yes Evenly placed around openings Post placement observations (finishing, curing, etc.)Yes concrete was manually finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-206 to 792-207  *Refer to associated concrete test report Notes:   As requested by Wright Pierce S.W.COLE rep Henry was onsite to observe concrete placement activities and perform concrete testing.  Ready-mix concrete trucks began arriving onsite at approximately 5;30 a.m. Delivery tickets were reviewed for concrete mix designation, batch time, truck number, aggregate size, and delivered quantity.  For the Exterior wall, concrete was supplied by Cape Cod Ready Mix concrete and was reported as a 4500-psi mix incorporating 1"1/2-inch nominal maximum aggregate. (2) loads of concrete approximately (23) cubic yards of concrete were reported to have been placed during this operation.  For the staircase , concrete was supplied by Cape Cod Ready Mix concrete and was reported as a 4500-psi mix incorporating 3/4-inch nominal maximum aggregate. (1) loads of concrete approximately (10) cubic yards of concrete were reported to have been placed during this operation. Concrete was discharged and transported to the placement area using a concrete pump by Marguerite Concrete . Placement operations were observed throughout the area, including areas adjacent to openings and corners. Concrete consolidation was performed using an internal vibrator and manual methods where necessary. During the observation period, no significant segregation or excessive bleeding was observed in the concrete being placed. Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com For the exterior wall, field concrete testing was performed during placement. Samples were obtained from Truck Nos. 60. Five (5) 6-inch by 12-inch concrete compression test cylinders were prepared  of concrete placement for subsequent compressive strength testing. For the staircase, field concrete testing was performed during placement. Samples were obtained from Truck Nos. 83. Six (6) 4-inch by 8-inch concrete compression test cylinders were prepared  of concrete placement for subsequent compressive strength testing. Staircase (Cylinder number 206) Truck 83, Load 1 Slump (ASTM C143) 5 inches Air Content (ASTM C231) 3.% Concrete Temperature (ASTM C1064) 70°F Exterior wall (Cylinder number 207) Truck 60, Load 1 Slump (ASTM C143) 5.5 inches Air Content (ASTM C231) 5% Concrete Temperature (ASTM C1064) 70°F Construction observation and testing activities were completed at approximately 10. a.m. Test results and observations were verbally reported to contractors rep while onsite prior to departure Attachments: 5 Photos Reviewed by:9/28/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com