Loading...
HomeMy WebLinkAboutHydrogeologic Evaluation 3/3/10 ,per COMMONWEALTH OF MASSACHUSETTS - EXECUTIVE OFFICE OF ENERGY & ENVIRONMPATTAT. AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROT opy ==- ' SOUTHEAST REGIONAL OFFICE �Jr j 20 RIVERSIDE DRIVE, LAKEVILLE, MA 02347 50£r 946 2700 DEVAL L.PATRICK [3 E©[ {J W[5 DD IAN A.BOWLES Governor Secretary TIMOTHY P.MURRAY MAR P 4 2010 LAURIE BURT • Lieutenant Governor HEALTH DEPT. Commissioner March 3, 2010 Mr. Todd J. Palmatier RE: YARMOUTH: Davenport Realty Coastal Engineering Company, Inc. Trust, Blue Water/Edge of the 260 Cranberry Highway (Route 6A) Sea/Riviera Beach Resorts, South Orleans, Massachusetts 02653 Shore Drive - Approval of Hydrogeological Evaluation Report Dear Mr. Palmatier: The Massachusetts Department of Environmental Protection has completed its review of the hydrogeological evaluation report dated August 2009 and submitted on behalf of Davenport Realty Trust. The report summarizes the results of a hydrogeologic evaluation conducted by your company to support a future Groundwater Discharge Permit Application for the above referenced property. The evaluation was conducted in accordance with the scope-of-work submitted by you on January 21, 2009 and approved by the Department. Notice of the availability of the scope-of-work was published in the Environmental Monitor. Blue Water/Edge of the Sea/Riviera Resorts are located on approximately eight (8) acres of land in the town of Yarmouth. Wastewater is currently disposed on-site by seven (7) subsurface sewage disposal systems. The proposed re-development has been designed so that wastewater flows will not increase. Wastewater will be treated and disposed off in accordance with 314 CMR 5.00. The design flow for the proposed wastewater treatment facility is 39,600 gallons per day. Pursuant to 314 CMR 5.09 (1) (f), MassDEP hereby approves the hydrogeologic report and authorizes the applicant to apply for an Individual Groundwater Discharge Permit (BRPWP 79) subject to the following conditions: 1. The design flow of the permitted groundwater discharges shall not exceed 39,600 gallons per day. 2. A groundwater monitoring plan shall be proposed in the Groundwater Discharge Permit application. Thls Information Is available in alternate format.Call Donald M.Comes,ADA Coordinator at 617-556-1057.TDD#866-539-7622 or 617-574-6868. DEP on the World Wide Web: http://www.mass.gov/dep 0Printed on Recycled Paper