Loading...
HomeMy WebLinkAboutCertified Inspection Report 5/23/85 Res.stered Professional Engineers Licensed Concrete Technicians Coastal Engineering Co. ARCHITECTURAL AND CONSTRUCTION ENGINEERS Box 477, Route 6a — Architectural Design and Engineering/Foundations/Shore Protection/Sanitary— Orleans, Mass. 02653 —Consultants for Structural Analysis,Project Feasibility,Cost Analysis— (617) 255-6511 File No. ; C-3417 May 23, 1985 Engineering Department Town Offices Yarmouth , MA 02664 Re : Riviera Beach Motor Inn South Street Yarmouth , MA Dear Sirs: Enclosed please find two ( 2) copies each of A) the Certified Inspection Report , dated 5-23-85; and , B) the "As-Built" Site Plan of Land in South Yarmouth , MA prepared for Palmer Davenport and David G. Mugar (Trustees) , dated 5-23-85, as prepared by Nickerson & Berger, Inc . , R.L.S. & P.E. Our findings indicate that the work has been completed in sub- stantial compliance with said plans, except for the following minor corrections : 1 ) Some shrubbery along the western property line need to be completed - it was expected to be completed 5-23-85. 2 ) Final cleanup to be done - it was expected to be completed 5-23-85. 3 ) A berm must be installed at the entrance drive to direct runoff water from the parking area into the catch basin. If you have any questions , please contact our office. Respectfully, COASTAL ENGINEERING CO. , INC. 144644JS / David J. Michniewicz , P. E. cc : Building Inspector Board of Health Agent CERTIFIED INSPECTION REPORT BY OWNER'S ENGINEER ESTABLISHMENT: RIVIERA BEACH MOTOR INN ENGINEER: COASTAL ENGINEERING CO., INC. ADDRESS: South Yarmouth, MA ADDRESS: Route 6A, Orleans. MA CHECKLIST: Approved Date 1. Clearing/grubbing/rough grading MRD 9-2R-R4 2. Certified plot plan - MRD 11-11-R4 3. Drainage system and easements a. number/size of basins/trenches MRD 11-27-R4 b. li" stone and width/4" peastone MRD 11-27-84 c. 8" high, H2O frames MRD 11-27-84 d. runoff contained on lot DJM 5-21-85 4. Water/utility installations. DJM 5-20-85 5. Subgrade MRD 12-05-84 6. Pavement - base course (2") MRD 12-05-84 7. Pavement - finish course (1") SDM 5-01-85 8. Berms/sidewalks (2" base, 1" finish) " SDM 5-04-85 9. Parking (10'x20')/required number 51 Required DJM 5-21-85 52 provided 10. Travel lanes (20' min.) • DJM 5-21-85 11. Buffer strips (widths/completeness) and screening DJM 5-25-85 12. Fire vehicle access DJM 5-20-85 13. Lighting of parking areas DJM 5-21-85 14. Trees (2" caliper/required number) 7 required DJM 5-21-85 21 provided Adequate loadingarea DJM 5-21-85 15. eq 16. Special conditions required by Board of Appeals NA 17. Special conditions required by Conservation Comm. See DEOF -r of Compliance 18. State curb cut work NA 19. As-built plans, as required DJM . 5-23-85 , 20. Final clean-up INCOMPL NOTE: The above checklist should be used as a guide only. Refer to the approved plans and the Town of Yarmouth Zoning By-laws (as revised). ENGINEER'S REMARKS: ENGINEER'S CERTIFICATION DAVID J. �Sp MICHNIEWICZ ,'o 3 CIVIL' sNo.31493,p 9o,�F•G�ST��\a4`� MNA RPd/mc (10/83) - Z3- 85-