HomeMy WebLinkAboutCCOR 10-02-2026 792-214Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com
Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:10/2/2026
Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 65 - 75°F S.W.COLE Rep:Riley Nordahl
General Contractor:CDM Smith Inc Time Onsite:06:30 - 08:05
Placement Type: Footing Wall Slab OtherPlacement Location:Slab 31 Exterior Wall
Concrete Placement Observations Observed Comments
Required mix used Yes 4500 PSI, 1.5", Sika Control 75
Concrete properly conveyed to all areas of placement Yes Concrete was conveyed using a pump truck
Internal vibration / consolidation of concrete Yes A handheld vibrator was used for the consolidation
of concrete
Even layering around openings and embedments Yes Concrete evenly layered and vibrated around
openings and embedments
Post placement observations (finishing, curing, etc.)Yes Concrete was manually finished with a trowel
Field Testing of Concrete performed:Yes
*CYLINDER SET NO:792-214 *Refer to associated concrete test report
Notes:
As requested by CDM Smith, S.W.COLE rep. Riley Nordahl was onsite to perform concrete field-testing services
associated with the referenced concrete placement.
S.W.COLE Engineering Construction Services Technician Riley Nordahl arrived onsite at approximately 6:30 AM.
Upon arrival, the S.W.COLE rep. met with Rayssa Fonte of CDM Smith, who provided an overview of the planned
work activities for the day.
Concrete was supplied by Cape Cod Ready Mix and consisted of 3/4-inch, 4,500 psi concrete with Sika Control 75
as an additive.
Approximately 27 cubic yards of concrete were placed during the observation period.
Concrete samples for field-testing and fabrication of compressive strength specimens were obtained from Load 1
of the placement.
Field-testing services were performed in general accordance with applicable ASTM test procedures.
Concrete test specimens were fabricated from the sampled concrete for subsequent laboratory compressive
strength testing at one three day interval, one 7-day interval, one 14-day interval, and one
28-day intervals.
One additional specimen was retained as a hold sample.
Field Test Results – Load 1
Slump: 7.0 inches
Air Content: 5.0%
Concrete Temperature: 73°F
Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com
Based on the field-testing performed on the sampled concrete, the measured slump, air content, and
temperature values were observed to be within the project-specified acceptance ranges at the time of testing.
Test results and observations were verbally reported to Rayssa Fonte of CDM Smith while onsite.
Upon completion of the requested services, the S.W.COLE rep. departed the site at approximately 8:05 AM
Attachments: 2 Photos Reviewed by:10/2/2026 Kaylie O'Su iv Kaylie O'Sullivan