Loading...
HomeMy WebLinkAbout2026 Annual Stormwater Management Permit Certification 170 Data Drive, Waltham, MA 02451 T: (781) 572-7482matthew.wozniak@nationalgrid.com  www.nationalgrid.com October 1, 2026 Yarmouth Conservation Commission Town Hall 1146 Route 28 South Yarmouth, MA 02664 RE: Annual Stormwater Management Permit Certification Yarmouth File No. SW2025-002 Boston Gas Company LNG Facility 127 Whites Path, South Yarmouth, Massachusetts Dear Members of the Yarmouth Conservation Commission, Pursuant to Condition 23(iv) of the Stormwater Management Permit issued for the above- referenced project, this letter serves as the Owner's Annual Certification. As of the date of this certification, no site work, land disturbance, clearing, grading, demolition, or construction activities associated with the approved South Yarmouth LNG Tank Replacement Project have commenced. Accordingly, no temporary or permanent stormwater management best management practices (BMPs) have been installed or placed into operation. Because construction has not yet begun, no operation or maintenance activities associated with the approved stormwater management system have been required or performed during the previous twelve-month period. Likewise, no stormwater control measures have been placed into service that would require inspection, repair, maintenance, sediment removal, or replacement. During the reporting period, the project has remained in compliance with the approved Stormwater Management Permit and associated plans and documents. The approved Operation and Maintenance Plan and Stormwater Pollution Prevention Plan remains in effect and will be implemented upon commencement of construction and operation of the stormwater management system. Construction is presently anticipated to commence in early 2027. Prior to the start of any site work, Boston Gas Company d/b/a National Grid will contact the Conservation Commission to schedule the required pre-construction meeting in accordance with Condition 11 of the Stormwater Management Permit and will provide the SWPPP as required by Special Condition 1. Matthew T. Wozniak Lead Environmental Engineer New England Environmental Permitting & Compliance, LNG Department 170 Data Drive, Waltham, MA 02451 T: (781) 572-7482matthew.wozniak@nationalgrid.com  www.nationalgrid.com Please consider this letter to satisfy the annual certification requirement for the current reporting period. Should you have any questions or require additional information, please do not hesitate to contact me at (781) 572-7482. Very truly yours, Matthew T. Wozniak PE Lead Environmental Engineer NE Environmental Permitting & Compliance, LNG Cc: Andrea Agostino – National Grid