Loading...
HomeMy WebLinkAboutCOC request 10.6.2026{ F _ CONSERVATION OFFICE PO eo RM &AUAza& af &v" &w" • All filings must be made on Town of Yarmouth forms. • All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. • Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. • Contact the Conservation Office if you need assistance. _- a-- (_. ..( Hardcopy of the COC application mailed to or dropped off at the conservation Office In Town Hall. Signed statement from an Engineer or similar professional who prepared the approved plan stating the date of a recent site inspection and certifying compliance with the permit and outlining departures from the approved plan, if any exist. If mitigation planting was required, include planting date and confirm the required time has elapsed*. _ As -Built plan meeting all Pian Requirements. — *Refer to the issued Order of Conditions: Special Conditions to determine if an as -built is required*. PDF of the COC request including application, letter, and as -built plan (if needed) emailed to bdirienzo(a-yarmouth.ma.us and iieralimo(a�yarmouth.ma.us Local filing fee. Refer to the Fee Schedule. Make check payable to "Town of Yarmouth" and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at hftps://www.varmouth.ma.us/696/Fil i n-Forms. *Click Yarmouth Street Index for parcel -related Conservation documents. Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Rev 6/2026 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 9 TTD# (508) 398-2231 • bdirieznofirvarmouth.ma.us Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance SE83-2462 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This request is being made by: forms on the Win Kyaw computer, use Name only the tab 359 Woburn Street key to move Mailing Address your cursor - do not use the Lexington MA _ 02402 return key. City/Town State Zip Code 347-749-0562 r� Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: rem Win Kyaw Applicant 03/11 /25 SE83-2462 Dated DEP File Number Upon completion of the work 3. The project site is located at: authorized in 10 Buttercup Lane South Yarmouth an Order of Street Address City/Town Conditions, the 119 34.2 property owner must request a Assessors Map/Plat Number Parcel/Lot Number Certificate of 4. The final Order of Conditions was recorded at the Registry of Deeds for: Compliance from the issuing authority stating Property Owner (if different) that the work or Barnstable 36884 167 portion of the Count Book y Page work has been satisfactorily completed. Certificate (if registered land) 5. This request is for certification that (check one): 0 the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc --rev 5129/14 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance SE83-2462 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.qov/eea/agencies/massdea/about/contacts/find-the-massdeio-reaional-office- for-your-city-or-town. html) wpaform8a.doc --rev 5/29114 Page 2 of 2 939 main street rte 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors September 29, 2026 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Ref: #10 Buttercup Lane, Yarmouth, MA (SE83-2462) Dear Commission Members: tel. (508) 362-4541 fax (508) 362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E. Craig J. Ferrari, E.I.T., S.E. Phellyp T. Tonial, E.I.T., S.E. In March 2025, the Commission issued an Order of Conditions for the above -referenced site, for the construction of a new stairway and pier. A site visit was made and a survey of the existing conditions relative to the Order was performed. All work has been completed, and the site was found to be in substantial compliance with the approved Site Plans with no observed deviations. This is to certify, to the best of my knowledge and belief, that the work was performed in substantial compliance with the approved plan and Order of Conditions. We respectfully request the issuance of a Certificate of Compliance. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Y: Y _.- '•r . ! "#'sae -' .�� r; i r iA ■ t :_s I �T V. �ljl VWI . A Ell 4f Wltv ol 11 A- -10 ML o6 mia •� � •, 'r•• �`t-� part% +y . .. 'i_.J i1_.'. ' �. �:� ... e