Loading...
HomeMy WebLinkAbout792-792-213 (2)58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:10/7/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 9/23/2026 Time Cast: 1:11 PM Date Received: 9/24/2026 Placement Location:Denitrification Filters, Center Section Placement Method:Pump Cylinders Made By:Robert Reuter Material Type:Concrete Cylinders Placement Vol. (yd ):167 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA 75 TEST RESULTS Slump (in) (C-143):8 Air Content (%) (C-231):5 Air Temp (°F):66 Conc. Temp (°F) (C-1064):72 Load Number:22 Mixer Num.:24 Ticket Num.:53971 Cubic Yards:11 Design (psi):4500 Batch 12:13 PM Arrive 1:01 PM Depart 1:35 PM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-213A N 29.3 5.98 28.06 9/28/2026 Lab Unbonded 5 3 130.35 4640 792-213B N 29.35 6.01 28.37 9/30/2026 Lab Unbonded 7 5 134.91 4760 792-213C N 29.35 6 28.27 10/7/2026 Lab Unbonded 14 5 156.07 5520 792-213D 29.3 10/21/2026 Lab 28 792-213E 29.3 10/21/2026 Lab 28 3 2 Remarks:Kaylie O'Sullivan Reviewed By