Loading...
HomeMy WebLinkAbout792-792-212 (2)58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:10/7/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 9/23/2026 Time Cast: 7:51 AM Date Received: 9/24/2026 Placement Location:SBR Tee Wall on slab 31 Placement Method:Pump Cylinders Made By:Robert Reuter Material Type:Concrete Cylinders Placement Vol. (yd ):41 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA 75 TEST RESULTS Slump (in) (C-143):8 3/4 Air Content (%) (C-231):4 Air Temp (°F):65 Conc. Temp (°F) (C-1064):69 Load Number:1 Mixer Num.:74 Ticket Num.:53952 Cubic Yards:11 Design (psi):4500 Batch 7:07 AM Arrive 7:36 AM Depart 8:35 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-212A N 29.25 5.98 28.07 9/28/2026 Lab Unbonded 5 5 114.16 4060 792-212B N 29.25 6 28.27 9/30/2026 Lab Unbonded 7 5 126.65 4480 792-212C N 29.3 6 28.23 10/7/2026 Lab Unbonded 14 3 160.48 5680 792-212D 29.25 10/21/2026 Lab 28 792-212E 29.25 10/21/2026 Lab 28 3 2 Remarks:Kaylie O'Sullivan Reviewed By