HomeMy WebLinkAboutPlanting plan 9.30.20269.30.26 - REVISED BY MOREL ORTA STUDIO LLC
reviewed by ERK Architects and Landscape - Lincoln MA
MAP 119, PARCEL 58
N/F JEAN, LOMBARDI
� C/0 EFFI'RY FANARA TRS.
P.O. /BOX • 775
DE- IS, N(A 026�8
D rI iBK: '15o
/
C�
100' OFF �' -- — _ _ z� /TAN K
TOP OF BANK /
STAGING AND WORK PROPOSED
AREA TO BE MODIFICATIONS SEE
SURROUNDED BY ARCHITECTURALS �\
WADDLE AND A SILT PROPOSED
FENCE �_ 2ND STORY DECK
50' OFFSET
TOP OF BANK— — -=
FEMA FLOOD ZONE AE 9
MAP 250015, 25001 c05831
35' OFFSET --
TOP OF BANKoo
RETAIN CLEAR ACCESS PATH Qj
TO EXISTING DOCK; MATCH N
EXISTING WALKWAY WIDTH
O■
TOP OF BANK ° ■
6't'
76,
Mq YF
0
\ �M B
�CBDH
4;�l
%
GRAVEL
DRIVEWAY
J
ALL GUTTERS TO BE
/ J
7 _
CONNECTED TO
/ J
/
DOWNSPOUTS, WHICH
WILL BE CONNECTED TO
RAIN BARRELS TO BE
4,}
REUSED FOR IRRIGATION.
EX. / o
ECK/�2n i
EX.
DWELLING / �/�N,
EX. 2ND
2 / STY.OVERHANG/ 76-
•pp pqC G`
J �A
8
CO
^oo
_ QHED/ /
h N,
HIGH TIDE
LOW- /
- 0.3' h
\ten
vrvv ���i
<P
x \
ADDITION AREA IS 544 SF X
2 = 1,088 SF OF MITIGATION
AREA. AREA SHOWN IN
GREEN IS 20 X 30 X 2 = 1,200
SF AND IS ADJACENT TO THE
r k, Ufit 'K, ci TOP OF BANK
WALKWAY
AND NIL-N
PLANTING AND MITIGATION PLAN
80 PLANTINGS, all of which are native
woody and grass/herbaceous plants
considered suitable for varied sun and
shade locations and are tolerant of a saline
environment. Species have been selected
from the UMASS Extension Landscape,
Nursery, and Urban Forestry Program's
Selection and Maintenance of Plant
Materials for a Coastal Environments. All
species currently exist in the existing site
landscape. Plantings are shown at
approximately 4.0 feet on -center spacing.
PLANTING SYMBOL KEY & SCHEDULE
Groundsel Bush
Baccharis halimitolia
Qty. 20 1 No. 2 container min.
0 Northern Bayberry
Morella pensylvanica
Qty. 20 I No. 2 container min.
Arrowwood
Viburnum dentatum
Qty. 20 1 No. 3 container min.
Switchgrass
Panicum virgatum
Qty. 20 1 No. 1 container min.
, -"CHARGER
MAP 120, PARCEL 18
N/F LUCY HULSE, CO—TRS.
KNOB COTTAGE TRUST
159 MAIN ST. 47/A
STONHAM, MA 02180
ED BK: 28299, PG 347
\
` PATIO WILL USE GRANITE
PAVERS FOR FLOORING
NOTES - REVISED 9.30.26
1. Preserve existing native vegetation and
pitch pines. Remove existing lawn/turf within
the mitigation planting area; do not disturb the
bank.
2. Where crushed stone occurs in the planting
area, remove it and prepare soil as
recommended by the landscape contractor
and issuing authority.
3. REMOVE EXISTING LAWN AND SOD
throughout the mitigation area before planting.
Prepare exposed soil for proper root
establishment; do not plant through existing
turf. Keep the dock access path clear.
4. Distribute all 80 plants throughout the full
20-foot buffer strip except the dock access
path. Use staggered spacing appropriate to
each species at maturity; adjust locations
around existing vegetation. Verify final
spacing and net planted area in the field.
5. Replace failed plants in accordance with
permit conditions and Conservation
Commission requirements. Any species
substitution requires approval.
6. Temporary above -ground irrigation may be
needed during establishment. Remove
invasive vines and plants in and around the
mitigation area as needed.
7. Monitor viability and submit written reports
in accordance with permit conditions and
Conservation Commission requirements.