Loading...
HomeMy WebLinkAboutCoastal Engineering Report 4/3/91 'egistered Professional Engineers & Land Surveyors (508) 255-6511 Coastal Engineering Co. • Civil&Architectural Engineering/Site/Foundation/Shore Protection/Sanitary• 260 Cranberry Highway •Consultants for Structural Analysis, Project Feasibility, Environmental• err y • Land Surveying• Orleans, Mass. 02653 File No. C 12-149 April 3, 1991 Bruce Murphy, Health Agent Town of Yarmouth Town Office Building So. Yarmouth, MA 02664 Re: Red Jacket Cottages Off South Shore Drive Yarmouth, MA Dear Bruce: On April 1 and 2, 1991 , we conducted inspections of the sewage disposal system installations made at the above-noted property. Our inspection of April 1 found the sewage disposal systems to be approximately 8" to 10" below the elevations specified on the plan, and the installation contractor was notified to correct the installations. On April 2, we reinspected the system installations. After the installation contractor made some additional corrections, the systems were determined to be in substantial compliance with the approved plans with respect to location and elevation. At the completion of our inspection on April 2, the installation contractor was installing the PVC pipe which interconnects the leaching trenches on Lot 1 , prior to backfilling both systems. It should be noted that the connections from the buildings to the septic tanks were not existing at the time of our inspection. However, the installation contractor had installed a short length of pipe into the inlet end of each septic tank, to which the plumber would connect his pipe. If you have any questions or need additional information, please contact me directly. •. ,.,.:px.�. ur�, . Very truly yours, INECEOVIED COASTAL ENGINEERING CO. , INC. APR 5 1991 .• 14 David J: Michniewicz,'P.E. DJM/smk cc: Paul McBride Arthur Sears & Sons