Loading...
HomeMy WebLinkAboutHydrogelological Evaluation Report 3/3/10 COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY&ENVIRONMENTAr AFR IRS »tt- DEPARTMENT OF ENVIRONMENTAL PROM' SOUTHEAST REGIONAL OFFICE 1 20 RIVERSIDE DRIVE,LAKEVILLE,MA 02347 50S 91C 2700 DEVAL L.PATRICK IAN A.BOWLES Governor Q M C IE Q d IE p Secretary TIMOTHY P.MURRAY MAR 0 4'man LAURIE BURT Lieutenant Governor Commissioner HEALTH DEPT. March 3,2010 Mr.Todd J.Palmatier RE: YARMOUTH:Davenport Realty Coastal Engineering Company,Inc. Trust,Red Jacket Resort,South Shore 260 Cranberry Highway(Route 6A) Drive-Approval of Hydrogeological Orleans,Massachusetts 02653 Evaluation Report Dear Mr.Palmatier: The Massachusetts Department of Environmental Protection has completed its review of the hydrogeological evaluation report dated August 2009 and submitted on behalf of Davenport Realty Trust. The report summarizes the results of a hydrogeologic evaluation conducted by your company to support a future Groundwater Discharge Permit Application for the above referenced property. The evaluation was conducted in accordance with the scope-of-work submitted by you on January 21, 2009 and approved by the Department. Notice of the availability of the scope-of-work was published in the Environmental Monitor. Red Jacket Resort is located in approximately six (6) acres of land in the town of Yarmouth. Wastewater is currently disposed on-site by separate subsurface sewage disposal systems located around the property. The proposed re-development has been designed so that wastewater flows will not increase. Wastewater will be treated and disposed off in accordance with 314 CMR 5.00.The design flow for the proposed wastewater treatment facility is 27,620 gallons per day. Pursuant to 314 CMR 5.09(1)(f),MassDEP hereby approves the hydrogeologic report and authorizes the applicant to apply for an Individual Groundwater Discharge Permit(BRPWP 79)subject to the following conditions: 1. The design flow of the permitted groundwater discharges shall not exceed 27,620 gallons per day. 2. A groundwater monitoring plan shall be proposed in the Groundwater Discharge Permit application. This information is available in alternate format.Call Donald M.Comes,ADA Coordinator at 617-556.1057.TDDB 866-539-7622 or 617-574.6868, DEP on the World Wde Web:http://www.mass.gov/dep 0 Printed on Recycled Paper Please be advised that this approval is not a Groundwater Discharge Permit. It does, however, authorize the project proponent to submit an Individual Groundwater Discharge Permit application for the discharge described at the evaluated location. The Department requires that the Individual Groundwater Discharge Permit application (BRPWP 79) be accompanied by a transmittal form and include all required supporting documentation. Included in the supporting documentation shall be a certification from a Massachusetts Registered Professional Engineer that the approved Hydrogeological Report has been reviewed and accurately reflects site conditions as of the date of the permit application. Information on any changes noted during the review shall be included in the Engineering Report that accompanies the application. Should you have any questions regarding this matter, please contact Christos Dimisioris at (508) 946-2736. Very truly yours, Brian A. Dudley Bureau of Resource Protection D/CD/ cc: Mr. Bruce Murphy Yarmouth Board of Health 1146 Route 28 Yarmouth, Massachusetts 02664 Mr. Trevor Meyer Davenport Realty Trust 20 North Main Street South Yarmouth, MA 02664 DEP-Boston Attn: Wastewater Management DEP-SERO Attn: Laura Black P:1Hydrogeo\Yarmouth-Red Jacket Hydrogeo approval cover letter.doc