HomeMy WebLinkAboutWell Completion Report 3/18/09 do r Massachusetts Department of Conservation and Recreation
Office of Water Resources
ID Well Completion Report 06-MAR-09 09:41:24
WELL LOCATION 258575
GPS North: 41° 38.689' GPS West: -70° 12.152'
Address:291, S Shore Dr Property Owner/Client: c/o Coastal Engineering
Subdivision Name:Bluewater Mailing Address: 260 Cranberry Hwy
City/Town:Yarmouth i MAR 1 H?()n9 City/Town, State:Orleans MA
Assessors Map: :_P(, Assessors Lot #: Permit Number:
`Board of Health permit obtained:(4 ' ' Date Issued:
/Work Performed Pro posed uee Drilling Method Overburden Drilling Method Bedrock
New Well Monitoring - 4 wells at this location. Auger
CASING
From (ft) To (ft) Type Thickness Diameter
.00 -10.00 PVC Schedule 40 2.00
SCREEN
From (ft) To (ft) Type Slot Size Diameter
-10.00 -14.00 Slotted PVC .010 2.00
WELL SEAL / FILTER PACK / ABANDONMENT MATERIAL
From (ft) To (ft) Material Description Purpose
WELL TEST DATA (ALL SECTIONS MANDATORY FOR PRODUCTION WELLS)
Date Method Yield Time Pumped Pumping Level Time to Recover Recovery
(GPM) (hrs & min) (Ft. BGS) (Hrs & Min) (Ft. BGS)
STATIC WATER LEVEL (ALL WELLS) PERMANENT PUMP (IF AVAILABLE)
Date Depth Below Ground Pump Description:
Measured Surface (ft) .Type: Intake Depth:
02/04/2009 6 Nominal Pump Capacity: Horsepower:
WELL DRILLER'S STATEMENT
ADDITIONAL WELL INFORMATION Driller: Patrick Desmond
Developed:No Fracture Enhancement:No Supervisor: Patrick Desmond Rig it:138
Disinfected:No Well Seal Type:Concrete Firm: Desmond Well Drilling Inc.
Total Well Depth: 13.000 Depth to Bedrock: Registration #: 877 Date Complete:02/04/2009
Comments:
OVERBURDEN
From To Description Color Comment Water Loss/Add Drill Drill
(ft) (ft) Zone of Fluid Stem Drop Rate
.00 13.00 Fine to Coarse Sand Brown Yes N/A
BEDROCK
From To Code Comment Water Drill Extra Drill Rust Loss/ # of
(ft) (ft) Zone Stem Large Rate Stain Add of Frac
Dron per ft
1/1