Loading...
HomeMy WebLinkAboutWell Completion Report 3/18/09 do r Massachusetts Department of Conservation and Recreation Office of Water Resources ID Well Completion Report 06-MAR-09 09:41:24 WELL LOCATION 258575 GPS North: 41° 38.689' GPS West: -70° 12.152' Address:291, S Shore Dr Property Owner/Client: c/o Coastal Engineering Subdivision Name:Bluewater Mailing Address: 260 Cranberry Hwy City/Town:Yarmouth i MAR 1 H?()n9 City/Town, State:Orleans MA Assessors Map: :_P(, Assessors Lot #: Permit Number: `Board of Health permit obtained:(4 ' ' Date Issued: /Work Performed Pro posed uee Drilling Method Overburden Drilling Method Bedrock New Well Monitoring - 4 wells at this location. Auger CASING From (ft) To (ft) Type Thickness Diameter .00 -10.00 PVC Schedule 40 2.00 SCREEN From (ft) To (ft) Type Slot Size Diameter -10.00 -14.00 Slotted PVC .010 2.00 WELL SEAL / FILTER PACK / ABANDONMENT MATERIAL From (ft) To (ft) Material Description Purpose WELL TEST DATA (ALL SECTIONS MANDATORY FOR PRODUCTION WELLS) Date Method Yield Time Pumped Pumping Level Time to Recover Recovery (GPM) (hrs & min) (Ft. BGS) (Hrs & Min) (Ft. BGS) STATIC WATER LEVEL (ALL WELLS) PERMANENT PUMP (IF AVAILABLE) Date Depth Below Ground Pump Description: Measured Surface (ft) .Type: Intake Depth: 02/04/2009 6 Nominal Pump Capacity: Horsepower: WELL DRILLER'S STATEMENT ADDITIONAL WELL INFORMATION Driller: Patrick Desmond Developed:No Fracture Enhancement:No Supervisor: Patrick Desmond Rig it:138 Disinfected:No Well Seal Type:Concrete Firm: Desmond Well Drilling Inc. Total Well Depth: 13.000 Depth to Bedrock: Registration #: 877 Date Complete:02/04/2009 Comments: OVERBURDEN From To Description Color Comment Water Loss/Add Drill Drill (ft) (ft) Zone of Fluid Stem Drop Rate .00 13.00 Fine to Coarse Sand Brown Yes N/A BEDROCK From To Code Comment Water Drill Extra Drill Rust Loss/ # of (ft) (ft) Zone Stem Large Rate Stain Add of Frac Dron per ft 1/1