Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-214 (4)
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:10/30/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 10/2/2026 Time Cast: 7:40 AM Date Received: 10/3/2026 Placement Location:SLAB 31, EXTERIOR WALL Placement Method:Pump Cylinders Made By:Riley Nordahl Material Type:Concrete Cylinders Placement Vol. (yd ):27 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):7 Air Content (%) (C-231):5 Air Temp (°F):66 Conc. Temp (°F) (C-1064):73 Load Number:1 Mixer Num.:69 Ticket Num.:37419 Cubic Yards:10 Design (psi):4500 Batch 7:10 AM Arrive 7:25 AM Depart 7:30 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-214A N 29 6 28.23 10/5/2026 Lab Unbonded 3 3 134.56 4760 792-214B N 29 6 28.27 10/9/2026 Lab Unbonded 7 3 149.76 5300 792-214C N 29 6 28.27 10/16/2026 Lab Unbonded 14 5 158.62 5610 792-214D N 29 6 28.32 10/30/2026 Lab Unbonded 28 3 193.08 6830 792-214E 29 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By