Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-219
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:10/26/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 10/19/2026 Time Cast: 9:33 AM Date Received: Placement Location:ROOF SLAB OVER SBR PIPE GALLERY SLAB 31, WALKWAYS ABOVE SLABS 1, 5, 12, 10 13, AND T WALL ON SBR SLAB 44 Placement Method:Pump Cylinders Made By:Alexander Charnitsky Material Type:Concrete Cylinders Placement Vol. (yd ):165 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F): 64 Maximum (°F): 75 Admixtures:SIKA 75 TEST RESULTS Slump (in) (C-143):7 Air Content (%) (C-231):5.5 Air Temp (°F):58 Conc. Temp (°F) (C-1064):71 Load Number:9 Mixer Num.:54 Ticket Num.:54393 Cubic Yards:11 Design (psi):4500 Batch 9:07 AM Arrive 9:17 AM Depart 9:40 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-219A N 28.7 6.01 28.37 10/26/2026 Lab Unbonded 7 3 144.32 5090 792-219B 28.7 11/2/2026 Lab 14 792-219C 28.7 11/16/2026 Lab 28 792-219D 28.5 11/16/2026 Lab 28 792-219E 28.65 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By