Loading...
HomeMy WebLinkAboutCCOR 10-27-2026 789-222 to 789-223Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:10/27/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 56 - 61°F S.W.COLE Rep:Alexander Charnitsky General Contractor:Nickerson Time Onsite:06:30 - 10:00Placement Type: Footing  Wall  Slab  Other Placement Location:WAS Tank Center Base Slab, SBR 1 Walkways Concrete Placement Observations Observed Comments Required mix used Yes 4500psi, 1 1/2", Sika 75 Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Handheld vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:789-222 to 789-223  *Refer to associated concrete test report Notes: As requested by Wright-Pierce, S.W. COLE rep was onsite to perform concrete sampling and concrete testing at the locations referenced above. S.W. COLE rep Alex Charnitsky arrived onsite at approximately 5:30 AM to perform the requested services. S.W. COLE rep observed concrete placement during the sampling and testing activities. Concrete Delivery Truck 73, Load 1, arrived onsite carrying approximately 11 cubic yards of 4,500-psi concrete containing 1-1/2-inch aggregate. Project personnel added Sika 75 admixture to the concrete prior to placement. The contractor placed the concrete via pump truck. Approximately 131 cubic yards of concrete were placed during this visit. Two sets of field tests were performed on sampled concrete and yielded the following results: Truck 81 – Load 1 Slump: 7.5 inches Air Content: 5.3% Concrete Temperature: 66°F Truck 67 – Load 1 Slump: 8.0 inches Air Content: 5.5% Concrete Temperature: 66°F Two sets of 6×12-inch compression test cylinders were fabricated for laboratory testing at 7, 14, and 28 days (two cylinders), along with one additional hold cylinder Attachments: 1 Photos Reviewed by:10/29/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com