Loading...
HomeMy WebLinkAboutEngineered Plan - 2000BENCH MARK: TOP OF FND. ELE. = 50.0 47.50 10' MIN. ---{ - 2r. f 10' (SAS) SHALL BE 34.25' LONG MANHOLE COVERS TO EXTEND TO 11.0' WIDE WITHIN 6" OF FINISH GRADE 10" DEEP U USE NEW L 1,500 GAL r i O d. r r 6' CRUSHED STONE SOIL TEST LOG PERC RATE= 2 MIN/INCH DEPTH 0 ELEV.= 49.00 A/E LOAMY SAND 10YR 4/1 9' B LOAMY SAND 10YR 5/6 16' 47.67 PERC BOTTOM ® EL a 45.83 Cl MEDIUM SAND 10YR 8/4 72' 43.00 C2 MEDIUM SAND 10YR 8/1 120' 39.00 SOIL .TEST. CONDUCTED ON MAY 20, 2000 BY HUNTER ENGINEERING ASSOC. WITNESSED BY: KELDA GORMAN, AGENT YARMOUTH HEALTH DEPARTMENT NO WATER OBSERVED @ 120" PERC BOTTOM @ 38" GAS BAFFLE REQ'D r2% ,—T- D.B. 46.93 46.76 46.73 6'C USHED TONE , 6' 3 45.90/ 20' MIN. PROPOSED SEPTIC SYSTEM NO SCALE 2" PEASTONE TOPPING ELEV=47.23 "NO BREAKOUT" CAP ENDS 4 to 1-1/2 DOUBLE WASHED STONE ALL AROUND I 1.5- 31.25 1.5 USE FIVE (5) INFILTRATORS WITH 4' OF STONE @ SIDES 8c 1.5' OF STONE @ ENDS 17x90. 47x90 • 48--- ----="®=.. —-- 4S 13' Remove 14' -)ak -- —_ - _ -- - - - 8'x8' shed y 1 CP �, ------ r; ---------- 9X00 -------9x00 I ;