Loading...
Engineered Plan - 2013TOP OF FOUNDATION 20 FT. UM FROM CELLAR OA CRAWL. SPACE ELEV. = lamoo_ 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB (ASSUMED) cON�ETE COVERS 4" SCHEDULE 40 PVC PIKE �-z- 7 MIN. PITCH 1/8" PER FT. 2• 4" CAST IRON PIPE Pff--4-� ITCH U 4) PERI MUFTM�j I Al 11 \nL1 AM,, TEE CLEAN SAND INSPECTION PORT LOAM AND SEED 2" LAYER OF 1 /8' TO 1/2" WASHED STCNi OR FILTER FAE MIK I FLOW LINE k Co _ l7,67 1O� 00000000000 ELEV. -TMIN. _...j i-ELEV. _ _Wi Lil O°° ° 00000000000 ° ° ° ELEV. - NsZQ � ELEV. SUMP ELEV. ° e°0 0 O O 0 O O Cl0 O`0 O ° :r DIS?RW"ON ° s ELEV. _ ° ° o ° ° 0 0 0 0 0 0 O C3 0 0 0 o ° ° °ELEV. _ Wo OUTLET BOX �1Q TEF (EXISTING) TO BE WATER TESTED 2 500 GALLON GALLEYS WITH 19 INCH INCHES IF MORE THAN ONE OUTLET STONE IN AN 24 INCCH�S 1000 GNCH ALL (TO BE PLACED ON FIRM BASE) 12' X 2'Y X r TRENCH FORMATION WELL__ I LO ZONE INCHES SEPTIC TAW 3/4" TO 1 1/2- CLEAN SOIL ASSORPIM INDEX .._� DOUBLE WASHED STONET� ��� AD�1ST do FREE OF FINES SILT S S� SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE( USGS PRAWA/ R TA81.) V. NOT TO SCALE BOTTOM OF TEST HOLE ELEV. EXISTING SPOT ELEVATION 00„0 EXISTING CONTOUR----00---- FINAL $POT ELEVATION MU FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE -0- TOWN WATER =W �*•"sW�= CATCH BASIN GAS LINE CLEAN OUT C• CESSPOOL C.P. Q 111w s f m l REV. LOCATION MAPS SHT. 1 i': Sd ZA , �00 ' IT: W Y I FLOW LINE k Co _ l7,67 1O� 00000000000 ELEV. -TMIN. _...j i-ELEV. _ _Wi Lil O°° ° 00000000000 ° ° ° ELEV. - NsZQ � ELEV. SUMP ELEV. ° e°0 0 O O 0 O O Cl0 O`0 O ° :r DIS?RW"ON ° s ELEV. _ ° ° o ° ° 0 0 0 0 0 0 O C3 0 0 0 o ° ° °ELEV. _ Wo OUTLET BOX �1Q TEF (EXISTING) TO BE WATER TESTED 2 500 GALLON GALLEYS WITH 19 INCH INCHES IF MORE THAN ONE OUTLET STONE IN AN 24 INCCH�S 1000 GNCH ALL (TO BE PLACED ON FIRM BASE) 12' X 2'Y X r TRENCH FORMATION WELL__ I LO ZONE INCHES SEPTIC TAW 3/4" TO 1 1/2- CLEAN SOIL ASSORPIM INDEX .._� DOUBLE WASHED STONET� ��� AD�1ST do FREE OF FINES SILT S S� SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE( USGS PRAWA/ R TA81.) V. NOT TO SCALE BOTTOM OF TEST HOLE ELEV. EXISTING SPOT ELEVATION 00„0 EXISTING CONTOUR----00---- FINAL $POT ELEVATION MU FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE -0- TOWN WATER =W �*•"sW�= CATCH BASIN GAS LINE CLEAN OUT C• CESSPOOL C.P. Q 111w s f m l REV. LOCATION MAPS SHT. 1 i': Sd • � ... - � .. �, - � u., Bic .. x.91, d` "Sw�f