Loading...
HomeMy WebLinkAboutEngineered Plan - 2014ALL TE LL SYSTEM PROFILE RK DS WITHCMAGNETIC TTAPEAOR BE (NOT TO SCALE) COMPARABLE MEANS FOR FUTURE LOCATION. PROVIDE MIN. 20" DIAM. WATERTIGHT ACCESS COVERS TO WITHIN 6" OF FIN. GRADE 2" PEASTONE OR GEOTEXTILE CONCRETE COVERS TO WITHIN 3" GRADE 5, FILTER FABRIC OVER STONE inkim ui -m' nr rnwro nvro DOC -!`ACT I I F 2% SLOPE REQUIRED OVER SYSTEM 21.0' PRECAST H-10 BLOCKS OR RISERS (TYP.)MORTAR ALL PRECAST RISERS y'* 4"0SCH40 PVC 19,2 COMPONENTS H-10 PIPES LEVEL 1ST 2' (NP,) INV'S EL. 17.17' 14" o ➢>) °, °®®�® e TEE TEE�® oo°o°.°010" EXISTING o°o° ° "0000000.0 ®®®® ® O ��oao0oo1f78 En TEE SEPTIC TANK 0 o°000® >°°°°° ooaooo0o0o0� °°0°°°° °°°°°°° °°0°0°0 000o,oao°0o°1°00°0 ® 0000°0 ® 00GAS BAFFLE 00000°® 0°0000°® __0 . °0000 000°000 °0°0°00o 00 ° _°00000 17.49' 1732' ° 4' LIQ. LEVEL (ACME OR EQUAL) 3/4"-1-1/2" DOUBLE WASHED STONE H-10 500 GAL. LEACHING CHAMBER BY ACME PRECAST OR EQUAL. (2) UNITS REQUIRED OVERALL DIMENSIONS TO OUTSIDE OF STONE: 30.0' X 10' 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [2]) WATER -TEST D'BOX FOR LEVELNESS (--L% % SLOPE) (-L 7. SLOPE) -11 10.0' BOTTOM TH-1 16' D' BOX 17 FOUNDATION EXIST. SEPTIC TANK ' LEACHING NO GROUNDWATER FOUNDFACILITY *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL **INSTALLER SHALL CONFIRM MINIMUM SEPTIC TANK SIZE AT UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS 1000 GALLONS AND ITS SUITABILITY FOR RE -USE. REPLACE PRIOR TO INSTALLING ANY PORTION OF SEPTIC, SYSTEM WITH. 1500 GALLON SEPTIC TANK APPROPRIATE TO SITE CONDITIONS IF NOT SUITABLE TEST HOLE LOGS ENGINEER: DANIEL E. GONSALVES, SE WITNESS: PHIL RENAUD (BoH) DATE: 4/16/14 PERC. RATE _ < 2 MIN/INCH CLASS I SOILS N 11" w LS 1OYR 3/2 ELEV. 20.5' B LS 2901 1 OYR 5/6 18 1' C PERC M/CS 1OYR 6/6 126" I 110.0' NO GROUNDWATER ENCOUNTERED 14-066 27 >t19.18 � 8�' FFNcF EX. ST /" k x 21.34 " 2 .05 21.66 x21.41 DBOX �/ 18" + ' MAPLE BOXWOOD 22.4 21.98 OVERFLOW// 36'x 21.86 } SHED PIT 22.18 }x 21.97 X 22.29 DECK 22.36 cV J)) 3.30 � � 2.06 22.38 { 6 .. 2(22935 1. 2.69 x2 21.97 RHODY 22 SANDBOX �k o k 22.21 Scale: 1 "= 20' mmmml 0 10 20 30 40 50 FEET BENCHMARK: USE CORNER OF BULKHEAD AT EL. 22.4' 7 20.19 ).99 EXISTING DWELLING TOP FNDN EL.=23.5' GAS METER 21.92 .06 NOTES 1. DATUM IS APPROX. NGVD 2. MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H-]_( 18.0' 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 15.17' 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 7' 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED 5' BENEATH AND AROUND THE PROPOSED LEACHING FACILITY. 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN SAND. LOT 8 13,059 SF 20.57 20.69 .311p // / 2 06 / �.52 0.89 .01 �/ 21.8'_1 x,,21.90 \ \ \ \ 2 5 PAVED \ \ DRIVE X22.26 \ LOCUS MAP NOT TO SCALE ASSESSORS MAP 45 PARCEL 37 SITE LIES WITHIN APD SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED EXISTING 2 BEDROOM DWELLING DESIGN FLOW: 3 BEDROOMS @ 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 **RE -USE EXISIING 1000 GAL. SEPTIC TANK LEACHING: SIDES: 2 (30 + 9.83) 2 (.74) = 118 GPD BOTTOM 30 x 9.83 (.74) = 218 GPD TOTAL: 454 S.F. 336 GPD USE (2) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 2.5' STONE AT SIDES, 4' AT ENDS AND 5' BETWEEN UNITS"_ ­j Ilealth D.a �Y PR VED arae Date ion z MA APPROVED DATE BOARD OF HEALTH TITLE 5 SITE PLAN OF 29 PONDVIEW AVENUE WEST YARMOUTH PREPARED FOR BORTOLOTTI CONSTRUCTION/DUFFY APRIL 21, 2014 3.27s `' { �c is % off 508-362-4541 ��� ��� a� r ,` - \, ` a c � L I � � o � ,, , fax 508-362-9880 s >t downcope.com ��' l ; down cape el iftee�ing, MC.. v _ _ 1` Ik0 f`i.. v'f civil engineers land surveyors L 1_ 939 Main Street ( Rte 6A) DATE DANIEL A. OJALA, P.E., P.L.S. YARMOUTHPORT MA 02675 / x 21.33 O o / (v ,(21.18 . .66 QO LOCUS MAP NOT TO SCALE ASSESSORS MAP 45 PARCEL 37 SITE LIES WITHIN APD SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED EXISTING 2 BEDROOM DWELLING DESIGN FLOW: 3 BEDROOMS @ 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 **RE -USE EXISIING 1000 GAL. SEPTIC TANK LEACHING: SIDES: 2 (30 + 9.83) 2 (.74) = 118 GPD BOTTOM 30 x 9.83 (.74) = 218 GPD TOTAL: 454 S.F. 336 GPD USE (2) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 2.5' STONE AT SIDES, 4' AT ENDS AND 5' BETWEEN UNITS"_ ­j Ilealth D.a �Y PR VED arae Date ion z MA APPROVED DATE BOARD OF HEALTH TITLE 5 SITE PLAN OF 29 PONDVIEW AVENUE WEST YARMOUTH PREPARED FOR BORTOLOTTI CONSTRUCTION/DUFFY APRIL 21, 2014 3.27s `' { �c is % off 508-362-4541 ��� ��� a� r ,` - \, ` a c � L I � � o � ,, , fax 508-362-9880 s >t downcope.com ��' l ; down cape el iftee�ing, MC.. v _ _ 1` Ik0 f`i.. v'f civil engineers land surveyors L 1_ 939 Main Street ( Rte 6A) DATE DANIEL A. OJALA, P.E., P.L.S. YARMOUTHPORT MA 02675