Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2013BM 100.0 DOTING AT ALKOUT DOOR NOTES COVER WITH RISER COVER WITH RISER 6" BELOW GRADE 6" BELOW, BRAD 14" TEE & 96.53 GAS BAFFLE TO BE INSTALLLED EXISTING 1000 GALLON SEPTIC TANK 1. LEACHING PITS TO BE PUMPED OUT AND REMOVED, ALONG WITH ANY CONTAIMINATED SOIL. 2. INSTALL EFFLUENT TEE AND GAS BAFFLE ON EXISTING SEPTIC TANK 3. CERTIFIED PLOT PLAN REFERENCED DONE BY ELDREDGE SURVEYING COMPANY, 3/21/74. 105.9 100 PIPE TO BE LEVEL FOR 2' OUT OF D -BOX 96.1 H-20 D -BOX 6" COMPACT STONE OR COMPACTED B ASE (21) QUICK 4 HIGH CAPACITY H-10 INFILTRATORS 3 TRENCHES - (7 INFILTRATORS + 2 END CAPS) 3' X 28' WITH 6' BETWEEN TRENCHES - NO STONE INSPECTION PORT FINAL GRADE 0 99.16 TOP ® 96.16 BOTTOM EL 94.83 6.53' 88.3 EL BOTTOM OF TEST HOLE DESIGN CRITERIA NUMBER OF BEDROOMS: 4 BEDROOML�/� SOIL TEXTURAL CLASS: CLASS 1 (.74) DESIGN PERCOLATION RATE: < 5 MIN/IN GARBAGE GRINDER: NO LEACHING AREA REQUIRED 440/.74 = 595 SF SEPTIC TANK: 440 GPD X 200% = 880 GALLONS USE : EXISTING 1000 GALLON PROPOSED D -BOX: 6DB H-20 USE (21) QUICK 4 HIGH CAPACITY INFILTRATORS (34" X 48" X 16") 3- 3' X 28' TRENCH CONFIGURATION 6 END CAPS, NO STONE. BOTTOM AREA: (GENERAL USE APPROVAL FOR 7.93 SF/LF FOR TRENCH CONFIGURATION) 595 SF / 7.93 = 75; 75/4' = 18.75 UNITS USE: 21 UNITS 28 X 4' X 7.93 X .74 = 492 GPD Whittier tea• r xaycee's wy o 0 0y Buck Island TEST HOLE LOG DATE: 10-3-12 TEST BY: Michael O'Loughlin S.E. WITNESSED BY: Amy Von Hone PERC RATE < 5 MIN PER INCH R1 132" TEST HOLE #1 A LOAMY SAND 10YR 3/2 BW LOAMY SAND 10YR 5/6 35" PERC96.38 M. F. S. C 2.5Y 7/6 99.3 EL 98.97 EL #1 I I FLOOR PLANS (NTS) I I WATER NOT ENCOUNTERED w Z = z w bor �_ s tw Y � Z � J FAMILY POOL ROOM SUN BATH LBED closet ROOM 1/2 bath BED I BED FIRST FLOOR BASEMENT GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE & UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM IS TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 15.00:TITLE V. 3. PROPERTY LINE INFORMATION IS ONLY APPROXIMATE. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM UPGRADE. 4. DESIGNER TO INSPECT & CERTIFY OVER - DIG, WHEN REQUIRED BY PLAN, AND FINAL INSPECTION BEFORE BACKFILL. 5. CONTRACTOR TO PROVIDE 48 HOUR NOTICE FOR ANY REQUIRED INSPECTIONS. 6. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 7. THE TOP OF ALL SYSTEM COMPONENTS SHALL BE MARKED HATH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. 8. IF SOILS ARE FOUND UNSUITABLE OR DIFFERING FROM THOSE FOUND IN SOIL LOG CONTACT DESIGNER AND THE BOARD OF HEALTH. 9. IF UNSUITABLE MATERIAL IS FOUND IN THE PRIMARY OR THE RESERVE OF THE S.A.S. AN OVERDIG REQUIRING CLEAN GRANULAR SAND MEETING 310CMR 15.255(3) SHOULD BE USED AS FILL MATERIAL, 5' AROUND AND UNDER S.A.S.. 10. ALL 4" PIPE CONNECTION AT SEPTIC TANK AND D -BOX SHALL BE MORTARED IN PLACE. IF USING 18" PLASTIC RISER PIPES, THESE TOO SHALL BE MORTARED IN PLACE. rA b 4" 20" 132" Health D4 partmew P�D f7 M - Date TEST HOLE # 2 A LOAMY 10YR SAND 3/2 BW LOAMY SAND 10YR 5/6 C M. F. S. 2.5Y 7/6 97.97 EL 88.3 EL 99.3 EL 98.97 EL TER NOT ENCOUNTERED 97.63 EL 88.3 EL