Loading...
HomeMy WebLinkAboutEngineered Plan - 19974` CAST WH PrE r V om FT. jv. RLEV. ,. 92.4 CLEAN SAND r SCHEPULE 40 PVC PIPE MIN. PtT+CH i /8"' PER FT. 2' D'Y'ER OF 1/8' TO 1/2' 89.9 STONE VENT 1 CU. FT. OF CONCR ANCHOR www. i!`1 9`a.� � Q'�"�"'1 • • o L7 O C O O O-'�1 • 0 0 o n• • c' • C=3 •11*2* = 85.9 Ev 92,0 ELEV. 91.8 • ELEV. ,To • , D{ IBU o , ,ELEV. ELEV. 84.9 BOX__8IRg 3 FLOWOIFFUSORS , 3' STONE IEE PLACED ON Iii BAS TO BE MATER TESTED I t�}0 GALLON <<oo Mom TE{AN ONE OUTLET lox 30' x 2 SEPT{C TANK 3/4- TO 1 1/2 - WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE BOTTOM OF TEST HOLE OR USGS PROBABLE WATER TI OBSERVED WATER TABLE NOT TO SCALE ELEV. - ELEV. - WELL ZONE INDEX ADJUST NIA SOIL TEST DATE OF SOIL TEST 6/4197 SOIL TEST DONE BY TFQ IlLtUAS WITNESSED BY A. VQNJM OBSERVATION HOI E 1 ELEV.- 89.9 OBSERVATION HOLE 2 ELEV.- PERCOLATION RATE < jp MML/INCM AT __ 64'• INCHES HES PERCOLATION RATE MIN./INCH AT INCHES DEPTH HORI _ ---- _.. _ AO 3 COI. MOTT. OTHER C - 8 A LOAMY SAND MYR 4 /4 No TADCO ENVIRONMENTAL CONSULTANTS P.O. BOX 615, EAST DENNIS, MA 02641 508-385-2425 8-34 C� MED SAND MVR Vs SCALE y _ 2 0 ['5 -ATE JUNE 5 997 36 - ip C 2 MED SAND MYR 7f3 REVISED NO WATER ENCOUNTERED AT 120" ELEV. 79.9 tM T. A. DUIaAS w 619 LEGEND: EXISTING SPOT ELEVATION 00,10 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR SOI, TEST LOCATION UTIIJTY POLE -0- TOWN WATER—W CATCH BASIN GAS UNE G " DEPTH HORIZ TEXTURE COLOR MOTT. OTHER WATER ENCOUNTERED AT ELEV. - DESIGN CALCULATIONS 3 NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW (19—GAL./BR./DAY X 3 BR.) GAL/DAY REQUIRED SEPTIC TANK CAPACITY GAL ACTUAL SIZE OF SEPTIC TANK LQQCL_ GAL. SOIL CLASSIFICATION I DESIGN PERCOLATION RATE 5.2. MIN./IN. EFFLUENT LOADING RATE _74 GAL./DAY/S.F. LEACHING AREA 460 SO. FT. 10'X30' + 60+20' X 2' LEACHING CAPACITY (AREA X RATE) 544.4 GAL./DAY RESERVE LEACHING CAPACITY 340.4 GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF YAOUTH RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6` OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR VATHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED N PUCE. OBTAIN SUCH D>rM04INATiON FROM APPROPRIATE AUTHORITY. S. UM71ES SHOW ARE APPROXIMATE OKY, EXCAVATION CONTRACTOR IS TO CALL 'Dt0--SAFE` AT 1--apo-322-4B44 AT LEAST 72 HOURS PRIOR T'0 COMMtENONG WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE 8. PARCEL IS IN FLOOD ZONE C 9. LOT IS SHOWN ON ASSESSORS MAP 102 AS PARCEL S72 APPROVED: BOARD OF HEALTH DATE AGENT _ ---- _.. _ AO 3 PROPOSED PLOT PLAN FOR BILL HARRISON PROJECT LOCATIONIs 8 RICHARD ROAD TADCO ENVIRONMENTAL CONSULTANTS P.O. BOX 615, EAST DENNIS, MA 02641 508-385-2425 SCALE y _ 2 0 ['5 -ATE JUNE 5 997 _j REVISED REVISED LOCATION MAP JOB NO. 14zq rSHEET I OF I