HomeMy WebLinkAbout2014 May 05 - Sign Off Transmittal Sheet - Water Damage RenovationsKeith C. Gilmore Enterprises LLC
O_ P.o.Box 17 Centerville, MA 02632
OA�D. P: 508-420-9934 F: 508-420-9935
E:ilmoreenter nsesocomcast.nef
`
www.gilmoreenferprises.info
Client: John 8 Barbara Markus
11 Christopher Hall Wad
Yarmouthport, MA 02675
508-362-7018
Project: Water Damage
Restorations
Revisions:
Date: 5-1-14
Paae # 1
Drawn B �
/[ .l fYW �
Scale: 1/4" = 1�0„
These designs are not to be modified or cooied
without the cermission of Keith C. Gilmore Enterprises LLC
Kitchen 8 Dining room Header Detail
3py - 240 header fastened with 4' tinberbck screws • 4' O.C. staggered Joist hangers instaled to fbor joists typ.
4'-1 V2'
Existing 2x4 wal from typ,
Existirg 29 pantry header
Exieting 2x10 floor joist • 16' O.C.
2x10 mpporrfed concrete filed cobra tm
soil blocking of bad path to Spy 2x10 basement girder
� t by
Kitchen Vaulted Ceiling Frame Detail
Exisfiirg 2x8 rafters • 24. O.C. �
3'3 V8
7-6 V8'
6'-3 V4'
2'-2 3/8'
2'-9 117
0 _ Keith C. Gilmore Enterprises LLC
O_ P.O.Box 17 Centerville MA 02632
O P: 508-420-9934 F: 508--420-9935
0 E:ilmoreenter rises0comcast.net
9 P
www.Qi Imoreenterprises.i nfo
Existing 2x6 porch ceiling joists • 24. O.C.
Fastening Schedule: -SI
2x6 color tie - 3 16d ndb at each erd and at side of 2x12 rafter
2x12 =A rafter - 4 16d rib face ndbd into ede of existing 2x8 rafters
2 15d rdb each ede into too wal dote in combination with Amoson rafter tie cornectxxi
New Landing
8'-r
First Floor Remodel
Water Damage Restoration
3r-8•
64 3B'
7
1
LL L
2014
Client: John 8 Barbara Markus
11 Christopher Hall Way
Yarmouth ort MA 02675
p
508-362-718
Project: Water Damage
Restorations
Revisions:
Date: 5-1-14
New 242 vm&W ceiling rafters with 2x6 wibr ties • 24' O.C.
V2' eheekack with R38 irm btion 1yµ
I
Kitchen
Porch
Drawn Bv: ,�,�,��
0 _ Keith C. Gilmore Enterprises LLC
O_ P.O.Box 17 Centerville MA 02632
O P: 508-420-9934 F: 508--420-9935
0 E:ilmoreenter rises0comcast.net
9 P
www.Qi Imoreenterprises.i nfo
Existing 2x6 porch ceiling joists • 24. O.C.
Fastening Schedule: -SI
2x6 color tie - 3 16d ndb at each erd and at side of 2x12 rafter
2x12 =A rafter - 4 16d rib face ndbd into ede of existing 2x8 rafters
2 15d rdb each ede into too wal dote in combination with Amoson rafter tie cornectxxi
New Landing
8'-r
First Floor Remodel
Water Damage Restoration
3r-8•
64 3B'
7
1
LL L
2014
Client: John 8 Barbara Markus
11 Christopher Hall Way
Yarmouth ort MA 02675
p
508-362-718
Project: Water Damage
Restorations
Revisions:
Date: 5-1-14
Page # 2_
Drawn Bv: ,�,�,��
Scale: 1/4 1'0'/
" =
These designs are no+ to be modified or copied
without the permission of Keith C. Gilmore Enterprises LLC
New R-3 W3 Wal kotk w
New Wal Framirg
Keith C. Gilmore Enterprises LLC Client:
p
P.O.Box 17 Centerville, MA 02632
P: 508-420-9934 F: 508-420-9935
E: gilmoreenterprises�comcast.net
www.gilmoreenterprises.info
John 8� Barbara Markus
11 Christopher Hall Wad
Yarmouth ort MA 82675
p '
�-718
508-36-
Project: Water Dama e
� �
Restorations
Revisions:
Date: 5-1-14
Pae # 3
—�—
_ 0_
_
0 0
— —
0
Drawn -
Scale: = 1'�"
1/4"
These designs are not to be modified or copied
without the permission of Keith C. Gilmore Enterprises LLC