HomeMy WebLinkAboutEngineered Plan - 20066) Parking sha not be constructed over H10 scoc components. Proposed units
Ica
are H2O.
s 4 Q 7) property is bo by Property and property lines.
i 8) The property owner shall review design considerations to approve of total
tMY,
UF,
gn flow and nu of to be mipt of
payment for the pian and installation based on the plan shall be deemed
approval of the design flow by the owner.
9) The existing septic leaching shall be pumped and filled with material per Title
V abandonment the proposed SAS shall be
removed along with contammated soil and replaced with clean washed sand
per Title V specs.
10)System components to be 10 feet from water line. Sewer lines crossing the
`,
water lime shall be sleeved with 6 inch SCH 40 PVC with ends grouted.
11) If a garbage grinder exists it is to be removed and is the responsibility of the