Loading...
HomeMy WebLinkAboutEngineered Plan - 2014i ASSESSORS MAP: PARCEL: TEST HOLE LOGS , ��, ; l) The installation shall conii.,' with Title V acid `Town of YAMOUNBoard oL. FLOOD ZONE: _... SOIL EVALUATOR :II lealth Regulations. . __.. WITNESS • 2) The installer sliall verify the location of utilities, sewer inverts and septic REFERENCES �- p DATE : com onents installation and 7 1 p prior to instal setting base elevations. PERCOLATION RATE I 3) All gravity septic piping to be 4 inch Sell 40 PVC at 1/8" per foot. ''h P p p g p 1 e first 1�. ...`'}an"' 22� " f two feet out of the d -box to the leaching shall be level. 2- 1 _. 4 This lan i ed for ' ) P snot to be urihz property line determination nor an other TH-1 ' TH-2 y `pv a purpose other than the proposed system installation, .�m ...: .. .. r.... _ A � C-0 - LOCATION . j -- 5) All septic components must meet Title V specifications. "` i ► (�6) Parking shall not be constructed over H10 septic components. r._7) The pro ert is bounded by ro ert corners and ro ert lines. 11 P Y p P Y p p Y8) The property owner shall review design considerations to approve of total MAP design flow and number of bedrooms to be considered for design. Receipt - _ of payment for the plan and installation based on the plan shall be deemed approval of the design flow by the owner. s l -v 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per — — ---_ —. ®. I� -. +° Title V specs. 10) System components to be 10 feet from waterline. Sewer lines crossing the K water line shall be sleeved with 4 inch SCH 40 PVC with ends grouted if applicable. The proposed SAS is being 'installed below the water service line. The line is to be sleeved as aforementioned and maintained in place. SEPT] C SYSTEM! DES I GN 11) If a garbage grinder exists it is to be removed and is the responsibility of the i owner to ensure such. AA FLOW ESTIMATE i 1,2) The installer is to take caution in excavation around the gas line if such -- -- - exists. 13) The installer shalt verify the location, quantity and elevation of the sewer ----- LBIEDROOms �`.`T 1GAL/DAY/BEDROOM GAL/DAY lines exiting the dwelling prior to the installation. e� > SEPTIC TANK 14) This plan is representative only that'a system can fit on a property meeting Title V requirements. ez"\ �f/ 1) GAL/DAY x 2 DAYS GAL ' � ' USE � GALLON SEPTIC TAN' � L \0 t g,7 ' 1 > SIDE AREA. 2 56, BOTTOM AREA: /ST- AN —' +, '2 SEPTCC SYSTEWSECTION C, o ® - 15 !- -�- w 1 .r aw S - a U O 6 _ _ .... _. ZZ D BO 1 1 _ GAL SEPTIC TANK 33,5 x i2�a tZ, 1 S ITE AND SEWAGE GE PLAN i LOCATION: D[r 60L D �I I x ff fi�c.�th Uenith Depart -n -.2,i PREPARED FOR: .1 o 1- W- j b n►e Date SCALE: z , �- DAVID B. MASON R6 W DBC ENVIRONMENTAL. DESIGNS DATE: Z8 W- Z DATE HEALTH AGENT EAST SANDWICH. MA (508) 833-2177 i' .