Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2014 (New Well)- MINIMUM. INVERT EL E VA T i ONS DESIGN CRITERIA: FIRST 2 TO 9FF BE LEVEL 3':.MAX IMUM .COVER INVERT OUT. SEPTIC TANK: I0.4t DESIGN FLOW: ACCESS COVERS MUST BE WITHIN INVERT IN PUMP CHAMBER: 9.5 3 BEDROOMS AT //0 G.P.D. PER 6" OF FINISH GRADE TEE MIN 2 OF PEASTONE INVERT OUT PUMP CHAMBER: 9•25 ' BEDROOM EQUALS 330 G.P.D. 14.2 MIN 13.53 INVERT IN DIST. BOX: 13.27 LOCUS o 3/4" - 1 1/2" DIA. INVERT OUT DIST. BOX; 13.1- NO GARBAGE GRINDER F�TRp 13.2T 0 TI Q ` DOUBLE WASHED STONE I NVER T IN LEACH CHAMBERS: /J.03 µp 4 DIAM PIPE 2 " SCH 40 PVC ` %%8 13.1 ) 12.2 M.4RSH y BOTTOM LEACH CHAMBERS: 12.2 SEPTIC TANK REQUIRED: o /0.4 9.25 ADJUSTED GROUND WATER: 8.2 13.03' 4 YGI-CAPACITY INFILTRATOR 330 G.P.D. X 200% 660 GAL, --E- o � . HOMERs9.5 3 OUTLET CHAMBERS W/3.5 ' * STONE AROUND SEPTIC TANK PROVIDED: 1000 GAL EXISTING D-BOX 2-10'w X 14'1 X 10"d OBSERVED GROUND WATER: 6.6 1000 GALLONVENTED BOTTOM OF TEST HOLE #/: 5.4 SOIL ABSORPTION SYSTEM REQUIRED_ SEPTIC TANK H- /0 PUMP CHAMBER INDEX WELL SOW 252, ZONE A DESIGN PERC RATE ( 5 MI N/ I NCH w (EXISTING) WATERTIGHT AND MARCH Ql READING=47.5'.`ADJ-1.6' SOIL TEXTURAL CLASS I y FACTORY WATERPROOFED ' - - EFFLUENT LOADING RATE - 0.74 GPD/SF tt 16- CRUSHED STONE ORt330 GPD f 0.74 GPD/SF 446 S.F. REQU1RED CRUSHED STONE 0R ., MaRSH COMPACTED BASE I �PROVIDED: 4 HIGH CAPACITY INFILTRATOR Eo�E o CHAMBERS W/3.5 't STONE AROUND.' A-460 S.F. MAP A P PROF I L E•NOT TO SCALE 1 _ I 1 460 S.F. x 0.74 340 GPD GENERAL NO TES �\0 _-_____� ,r' �{ i �' I ,� 9, 41 azo SOIL TEST PIT DA TA I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTIONr' �r t r� S• I i'FFA, i�.� INDICATES INDICATES OF THE SEWAGE DISPOSAL SYSTEM ONLY. I\i I i PERCOLATION = OBSERVED / -- y.i 1 r� 54,;•, TEST = GROUNDWATER 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS t/ SET. SEE SITE PLAN. TP # 1 �» HORIZON TEXTURE COLOR 12.4 J. ALL CONSTRUCTION METHODS AND MA TER I AL S AND ) �� �,`�,' LAWN syF LOAMY MAINTENANCE OF THE SEPTIC SYSTEM SHALL �� �o, o Q IOYR CONFORM TO MASS. D. E. P. TI TLE 5 AND LOCAL SAND 2/2 �`� !j 2 7"--------------------- 11.8' BOARD OF HEALTH REGULA T I ONS .y 1 ` 1 \ B LOAMY IOYR e b \ SAND . 4/6 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER i R�� e�' \ SyFo 24 - - - - - - - - - - - - - - - - - - 10.4 AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER ExlsG \\ a MED-COARSE IOYR THAN 3` IN DEPTH SHALL BE CAPABLE OF WITH �, �p ����o� 1000 GAL \ 11.7 D'6' l SAND AND 5/8 STANDING H-20 WHEEL LOADS. o FR° } oeo SEPTIC TA l GRAVEL ID �V� w �w \ NEW PELL 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 OR WELL _ \ OP PUMP CHAY5 ��4 BM. CORNER STEP 12.5 \ 5� R /44 " ABANDONED APPROVED EQUAL. .�' EL-13.20 \ r.. �rw / BRICK PATIO t� 6. SEPTIC TANK. PUMP CHAMBER AND D-BOX SHALL BE ' _ , Eo�F 12.3+ ' - \\ �O P� 70 6.6 REINFORCED PRECAST CONCRETE, WATERTIGHT AND °,�tq - _ _ _kz_0 h6 _ WATERPROOF. D BOX SHALL BE WATER TESTED TO so/L REMOVAL- CHECK FOR LEVEL WHEN THERE IS MORE THAN ONE 106', I EE NOTE /o. �AgGF \ �k` s �� 4» 5.4 OUTLET.1 .0 ` E... ~ 12. \ 8 _ _ _ _ EW ! DATE MARCH 14. 2001 7. BEFORECONSTRUCTION CALL "DIG-SAFE 12 T i r Q 11.9 12.2 TEST BY: STEPHEN HAAS - - - Q 1- ti 1-888-DIG-SAFE AND THE LOCAL WATER DEPT. I TP#1 WITNESSED BY: AMY VONHONE' FOR LOCATION OF UNDERGROUND UTILITIES. � PERC RATE: < 2 MIN/INCH VENT - O4 HIGH CAPACITY.. BOX- 8. SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE DESIGN ENGINEER TWO DAYS PRIOR TO CONSTRUCTION JNFILTRATAs EW 2 �' + I f\ t� N 62, W/3.5'' STONE ARROUNOUND � 1 .6+ i' 13.4 � \ OF THE SYSTEM TO ALLOW FOR SCHEDULING OF THE 1S • ::• i - - l nom• \ \ CONSTRUCTION INSPECTIONS. ' fo'ty ELECTRIC LINE TO BE RELOCATED 9. EXISTING LEACH FIELD TO BE ABANDONED. THE LOCATION OF THE EXISTING ��\ � ••- /LS � _--- � \ SEPTIC SYSTEM SHOWN IN RED W4 ,l TAKEN FROM A SEPTIC SYSTEM INSPECTION - \ I2.� �2`� I Fw 3 l0. ALL. UNSUITABLE MATERIAL. (A &8 HORIZONS) ENCOUNTERED BELOW THE INVERT OF THE LEACHING DATED:03/04/2014. EXISTING WELL WAS - FACILITY TO BE REMOVED FOR A DISTANCE OF 5' LOCATED 06/09/20/4. �\ E '/ f S E R 7 C S YS 1 E M D E S ON V AROUND AND REPLACED W 1 TH SAND IN ACCORDANCE A �,. --- 71.9 WITH TITLE 5. ,:.; E 60 ALMS HOUSE ROAD MAP 140, PARCEL 44 ELEC TRANSFOMER k CRIDlSKFND YARMOUTHPOR T. M.4 x , . BOUYANCY CALCULATIONS: PREPARES FOR PUMP CHAMBER: DISPLACEMENT - 18.2-5.01 x 8.5 x 4.83 132 C.F. y 132 C.F. x 62.4 */C. F. - 8237#, H-10 TANK = 8240# OK G�g l 2014 CA F? L_ L ,A / VARIANCES REQ U I RED : HEALTH DEPT P. O. BOX 194. YARMOUTHPORT . MA 02675 PUMP SYSTEM NO TES • TITLE 5. MAXIMUM FEASIBLE COMPLIANCE " vac ve SECTION 15.212:(b) DEPTH TO GROUNDWATER S C.4 L E= 1 'a 2 0 .� P R 1 L /0. 2001 1. PIAVP TO BE MYERS RESIDENTIAL SEWAGE PUMP MODEL SRM4 `I PVC INLET 2 PVC OUTLET 5' /S REQUIRED BETWEEN THE BOTTOM OF THE SAS AND THE MAXIMUM REVISED: APRIL 27, 2001 OR EOVAL. MERCURY FLOAT sWrrc!!Es �E GROUNDWATER ELEVATION. 4' IS PROPOSED. A I' VARIANCE /S REQUESTED. REVISED- JULY 17, 2001 2. THE PUMP SHALL START AND STOP AT THE ELEVATIONS SHOWN. ALARM ON a CWCK PIAVPONC � ! J. THE PUMP SHALL BE INSTALLED IN STRICT CONFORMANCE WITH 4ro�4r,W VALVE TOWN: OF YARMOUTH HEALTH REGULATIONS EAGLE SURVEY I NG I NC THE MANUFACTURER'S SPECIFICATIONS AND TITLE V REGULATIONS, 92-3 R cDu t o 6 A PeMPOFF SECTION 3. 7: DISTANCES AND LOCATION OF DISPOSAL FACILITIES "\ PUMP DISCHARGE SHALL BE 2 INCHES. PUMP SHOULD BE ABLE TO 6'Sf/MP PUMP \� Y G1 Y TY 10 u t h P O T t MA . 02675 BE DISCONNECTED AND LIFTED Our of THE PUMP CHAMBER WITHOUT 150 IS REQUIRED BETWEEN THE SAS AND THE WELL. 105 IS PROVIDED, / -l�� (50S) 362-8-'I32 - HAVING TO ENTER THE PUMP CHAMBER. A 45' VARIANCE IS REQUESTED. 4. THE ALARM SHALL START AT THE ELEVATION SHOWN AND BE \ POWERED BY A CIRCUIT SEPARATE FROM THE PUMP POWER, PUMP DETAIL • NOT TO SCALE us l lvG 1000 GAL .'PUMP CHAMBER REVISED: JUNE 9. 2014 (NEW WELL) 5. AN ELECTRICAL PERMIT MUST BE OBTAINED FOR THIS INSTALLATION. WATERTIGHT AND WATERPROOF 0 /0 20 -; 40 JOB NO: 01-007 F l EL D; CFW/EEK CAL C: SAH/CFW CHECK: CFW DRN: `SAH