HomeMy WebLinkAboutEngineered Plan - 2014- i
i
I
ASSESSORS MAP:(
TEST. HOLE LOGS
PARCEL:4-1) The installation shall coni.;, will' Tille V and Town of p�J'I� Doard of.
-- I leal(h Itegulations•
FLOOD ZONE: ,,Ar� GfG SOIL EVALUATOR : ! �4Vt��
�_ 3T '� 2) '1'I'e installer shall verify the location of ut'I't'es, sewer 'nverts tu'd septic
WITNESS: VOL-4
1 :
REFERENCE: �, I components prior to installation and setting base elevations.
2�1 DATEZ01
� 3) All gravity septic piping to be 4 inch Scla 40 PVC at 1/8" per looL'I�he first
G PERCOLAT 10 RATE:. -< Z tMl' 1 two feet out of the d-box to the leaching shall be level.
�5
C-Ag1 % 4) This plan is not to be utilized for property line determination nor any other
.�__._�--v�-__ ___.� � 9 TI-1 I TH•- 2 purpose other than the proposed system installation.
w Ldp
5 All septic components must meet Title V specifications.
6) Parking shall. not be constructed over I 1 10 septic components.
J%
7 Thero ert is bounded by property corners and property lines.
p P Y
Jp itlt3% 8) The property owner shall review design considerations to approve of total
r►. _�__,, �� design flow and number of bedrooms to be considered for design... Receipt
LOCATION MAP q�l i
of payment for the plan and installation based on the plan shall be deemed
fib, Tv approval of the design flow by the owner. '
9) The existing leaching or cesspools shall be pumped and Tilled with material
Per Title V abandonment procedures. Those within the proposed SAS shall
1
be removed along with contaminated soil and replaced with clean sand per
Title V specs.
� 10) System components to be 10 Feet from water line. Sewer. lines crossing the
o i p L water line shall be sleeved with 4 inch SCI 140 PVC with ends grouted if
� applicable. Ce proposed SASis being installed below the water service
line. The line is to be sleeved as aforementioned and maintained in place.
11) If a garbage grinder exists it is to be removed and is the responsibility of the
SEPT -IC SYSTEM DESIGN
owner to ensure such.
12)The installer is to take caution in excavation around the gas line if such
FLOW ESTIMATE 1 exists.
2 13) The installer shall verify the location, quantity and elevation of the sewer
J BEDROOMS AT I ID'GAL/DAY/BEDROOM •�� GAL/DAY lines exiting the dwelling'prior to the installation.
14)This plan is representative only that a system can fit on a propertymeeting
SEPTIC TANK Title V requirements.
GAL/DAY x 2 DA �S - GAL
I 6�1 USE I'DM GALLON SEPT I C TANK
-J
01L.A880RPTION SYSTEM
jk� OF
5co 44t, LZA&,�w� DAVID �y
TI-i '�{ tr
L¢.7Cg B. r
� 7
MASON a �211yi . TI l1l,9to SIDE AREA. 1066e m,io / Q tBOTTOM AREA: 2_J5 12, Z57, ;
s c TV
.d•
SEPTIC SYSTEM SECTION
1
on
7 5r_011 (1.. F1go— W-06, 36 wU4X.
o
d I la_N":p1C r D-11
GAL �b�� _� ►h(." '%I V�I �o o o nn,,
SEPTIC, TA K
7,57
SITE AND SEWAGE PLAN
r
Yl ✓� {-� I� iii y� -1 I�p1�1` L O CAT ION:
_tml� �q VIA 14
• 3M l � L
�i ame Date
/ PREPARED FOR.
SCALE:
ON DAVID B. MASON,I\5 DATE: 0 It Zo1L
o
3 DBC ENVIRONMENTAL DESIGNS
EAST SANDWICH. MA
W DATE I HEALTH AGENT
(soa) 833-21.:77
Z