Loading...
HomeMy WebLinkAboutEngineered Plan - 1998U'r 8on �b AssEssoRs MA P ..z1NOTES!- PARCEL.- TEST HOLE LOGS G6E 8G7E i. VERTICAL DA TUh. ASSUMED FROMQUAD NGVD +/ ) ENGINEER: THOMAS McLELLAN, P.E. 2. MUNICAPAL WATER IS AVAILABLE. » N Al2(EL i0 ,. FLOOD ZONE. B&Al ) o THROUGHOUT SEPTIC .SYSTEM. b WITNESS. AMY. VON .HONE, R.S.RS. 3. SCHEDULE 40 4 PVC PIPE TO BE USED � „ 11-12-97 TS TO CONFORM WITH AASHTO . H-10 Ohl � DATE..4. ALL PRECAST UNI LOADING SPECIFICATIONS. � PERCOLATION RATE: .< 2 MIN IN C _-OTHERWISE). _ FOOT UNLESS NOTED � S. PIPE PITCH 1/8" PER , ( H-2 TH- 1 T PE OUT OFD BOX TO BE SET LEVEL. _ 6. FIRST 2' OF PI 11.0 LOCUS - ACCOMODATE THE a SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO c qf� ELEV. 7. THE e� 0/A E HORIZON GARBAGE 'DISPOSAL. // USE OF A LOAMY SAND 5� E faYR z i 8. ALL CONSTRUCTION DETAILS. ARE TO BE IN CONFORMANCE WITH TH � g � / X0.5 t1't a SS. -ENVIRONMENTAL CODE TITLE FIVE AND LOCAL 5 STATE OF MA ( � B HORIZON LOAMY SAND HEALTH REGULATIONS. LOCATION MAP 5 8 9.9- 24" foYR / 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR HORIZON TOTAL AREA C MEDIUM SAND TO CONSTRUCTION. s ' 21,000 S.F. 2.5Y 616 ` 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO (0.48 ± AC.) oo" EXCEED 3.0. f zs WITH SAND G CESS POOLS PUMPED AND ,FILLED. 11. EXISTING POOL(S) ARE TO BE PUMPED f1z" 1.7 OR REMOVED. SEPTIC SYSTEM HAS BEEN DESIGNED TO MAXIMUM 12. THE PROPOSED ER ADJUSTMENT: EM REQUIRES THE APPROVAL OF THE UscS GROUNDWATER FEASIBLE COMPLIANCE. THE SYST Q STANDARD CHAMBERS -29 ZONE: A ADJUSTMENT: 2.f ABOVE S INFILTRATORS ) WELL, M11P . ( FOLLOWING VARIANCE: f. SECTION_ 15.212: LEACH AREA TO BE 4.13':. WITH 4 OF STONE AROUND SIDES AND 1 x 7" DEEP GROUNDWATER. 3• AT ENDS (x725 z r ) DESIGN . SEPTIC SYSTEM 150. 00 ,11 FENCE FLOW ESTIMATE. 3 BEDROOM DESIGN, MINIMUM) BENCHMARK TOP OF 110 GAL DAY BEDROOM a 330 GAL/DAY �. BEDROOMS AT � � CONCRETE BOUND ELEV= 11.55' ` ' SEPTIC TANK: i 330 GAL DAY x 2 DAYS ffi 660 GAL i +10.9 Q USE 1000 GALLON SEPTIC TANK (EXISTING) TH-1 10.311.2 "y LEACHING AREA: -{- ..., ...: XPi USE 5 INFILTRATORS (STANDARD CHAMBERS) 2 WITH 4' OF STONE AROUND SIDES AND 3' AT ENDS DRIVE Ij DECK (37.25' x fr z 7" DEEP) ST 10' = GAL DAY GAS SIDE AREA (48 25)2 x 7/12 56 (.74) 41MINMETER � BOTTOM AREA: 3725 x 11 = 410 SF (.74) = 309 GAL/DAY u" NG -_ -- . - CITY' � 344. GAL DAY EXISTING � -CAPACITY / DWELLING ?l 1�' FL.'19 w SEPTIC SYSTEM SECTION EXISTING 10.2 2" PEASTONE EX � 0 COVERS WITHIN 1� INVERT 9 OF FINISHED.G�ADE 3/4"_- 1 1/2" 119 WASHED STONE FLOOR f0 FIRST F ELEV.= 8.8 � EDGE OF PAYE 8.83 150. ao' 7.73. ELEV. .58 8 8 - OX- 52 D B> ELEV. 835 _ ELEV.!l ZSINFILTRATOR 3' 4 BENCHMARK TOP of , 9.4 1500 GAL ELEV. 4 CONCRETE BOUND 10 (6 OF ELEV, -�--- 3725' ELEV= 9.80' SEPTIC TANK STONE 4.13' ER OR DER . (6" OF STONE UNDER UNDER) 8.31S STANDARD CHAMBERS) MECHANICALLY COMPACTED) OF STONE AROUND SIDES AND 9.0 ECFV.... WITH 4 ELEV. 3' AT ENDS (3725 DEEP x 1r x 7" ) (EXISTING) TEE SIZES. INLET. 6" UP, 13" DOWN » ADJUSTED GROUNDWATER ELEV.= 3.6 OUTLET. 6" UP, 14 DOWN (USING 1/2 OF THE USES ADJUSTMENT) (GAS BAFFLE AT OUTLET TEE) SITE AND SEWAGE PLAN KEY: 1,1'i1_5PAOVEDD BY: DATE: EXISTING CONTOUR: LOCATION.' PROPOSED CONTOUR. " OF Vi 43 ELDRI DGE ROAD � y.� ..� � ` EXISTING SPOT ELEVATION. 25.5 , y , 5 s 3.. wog- PROPOSED SPOT ELEVATION:2� MA �,� r�-��f SOUTH YARMOUTH, TEST HOLE yqj. R 2! . 3, UTILITY POLE. -0- ,� c. PREPARED FOR. FENCE LINE. �C PO HYDRANT. -b- CANCO SAN FILIP 0 .. 17 98 2 . �m a ; �,' � SCALE. i 30' DATE.. / / RETAINING BALL. D EMAREST McLELLAN ENGINEERING t N BOOK 75 PAGE 27 TREE:24 scxooL STREET P.O.Poeox 4ss PL sra REFERENCE.. ASSACHUSETTS 02 WEST DENNIS, ST JR. P.L.S. PHONE & FAX 508 398-7710 THOMAS McLELLAN, P.E. JOHN Z. DEMARE DM ' 97 172 (D26F30� ( ) b FES 2 Q 199 H F � H- DEPT.