Loading...
HomeMy WebLinkAboutEngineered Plan - 2003ROUTE 28 LOCUS 41 N T EST .., O LI LOGS NOTES.- ROUTE OTES. 1. VERTICAL DATUM: ASSUMED FROM QUAD NGVD ENGINEER: THOMAS McLELLAN, P.E. 2. MUA"ICAPAL vATE'R IS AVAILABLE, WITNESS. DAVID FLAHERTY, R.S. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. DATE:7-9-03 4. ALL PRECAST UNITS TO CONFORM WII`I :AASHTO H-10 & H-20 PERCOLATION RATE: < 2 MINIIN LOADING SPECIFICATIONS: 5, PIPE PITCH = 114" , � PER F OOT, (UNLE'SS NOTED OTHERWISE). TIS s 1 19.3 TH- 5. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. ELEv, 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE i OIA HORIZON i, LOAMY SAND USE OF A GARBAGE DISPOSAL. � 7" 4 'Oa R 41-0 18.7 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE --� B HORIZON STATE OF MASS. ENVIRONMENTAL ("ODE, (TITLE .FIVE) AND LOCAL LOCATION FLAP LOAMY SAND I 24" 10YR 616 17.8 .HEALTH REGULATIONS. LOT 67 ! � I�OR.IZOr1 - ' LL UTILITIES PRIOR9. CONTRACTOR TO VERIFY LO'dT01. OF A 6,500 S.F. FINE SAND ( TO CONSTRUCTION. � (0.15 AC.) 2.5Y 7/6 10. GROUND COVER 0€ ER ALL SEPTIC SYSTEM COMPONENTS NOT TO f 60" OBSERVED 14.3 � EXCEED 3.0'. ASSESSORS MAP. �. 11. AN ELECTRIC PERMIT IS REQUIRED PRIOR TO INSTALLATION OF � PARCEL.- _ �R�,aND 1O3 �SJ67) .FATER PUMP P SYSTEM. 12.v � FLOOD ZONE: C 12. SEPTIC TANK AND PUMP CHA.,AfBER ARE TO BE WATER PROOFED BY � USCS GROUND WATER ADJUSTMENT: MANUFACTURER WITH IPANE'.�X CON,.r RER`E ADDITIVE OR CONSEAL 55. WELL: MI1V-29, ZOSE: B, ADJUSTMENT (JUNE): 1.2' A Ci", EZ WRAP IS ALSO REQUIRED D FOR BOTH TANKS. I I 13. ALL UNSUITABLE SOIL (B .HORIZON, APPRO% 24" DEEP) WITHIN 5' OF a PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. - r ti SEPTICSYSTEM DESIGN 14. EXISTING CESS .FOOLS ARE TO BE PUMPED AND FILLED WITH SAND _ OR REMOVED. 15. SEWER .? LINE TO BE ENCASEIT IN A 5" PVC PIPE WH EN WITHIN FLOW ESTIMATE: 10' OF WATER LINE. a 19.7 � BEDROOMS AT' 110 CAL/DAY` BEDROOM - 220 CAL/DAY 15. A DEED RESTRICTION STATING THAT THIS DWELLING IS TO REMAIN'IS TO BE +19.4 2 BEDROOMS (UNLESS �I�E SEPTIC SYSTEM IS REDESIGNED) SEPTIC TANK RECORDED AT THE BARNSTABLE REGISTRY OF DEEDS. loo. 0. 00' C, 220 CALOD.AY x 4.5 DAYS - 990 CAL USE 1500.._ CALLON SEPTIC TANK �a ^ , i 19.9 LEACHING AREA: UTILITY EXISTING USE 3 INFILTRATORS (STANDARD CHAMBERS) ROOM BEDROOM a rELL' NG zit - 4' OF STONE AROUND SIDES AND 3' AT ENDS DED BED D 1r. c.,.- 19.7 �.�i WITH ROOM ROOM i/C A L SPACE) --�� ( x 11' x 7" DEEP) T - 9E.4 SIZE AREA: 5. 5 ? ��'12 = 42 (.74) = 31 GA£1.19A. ' -' 1 rPIVER LIVING 1 BOTTOM AREA: 24.75 x 11 = 272 SF l74) = 201 _ GAL f DA ' FKIT,ROOM o ! 9.4 l k_-� d �= - CAPACITY =232 CAL f Li 4i' 10' COiC 19.9 SEPTIC SYSTEM SECTIO E XISTINCI F rOOR PLAN ST : c TC 101.10a. CP � COV€:S WITHIN 12" OF COVER SE?A1GRADE .. 2'w=EAST"NE 11FINISHED GRADE jdis t� 195 FIRST FLOOR NE COYER WITHIAl 21.0 314„-1 112" 100. o " PRESSULINE fL�OE GRADE) FASIED STONE 7 i t fF"AS BENCHMARK AT COVER I ELEV.-20.3 INLET CONCRETE BOUND INSi E CT101 + E'LEV= 19.74' 111 f 18.4 1 18.fi J� 17 f >�� I 17.4 )L _ # f PORT ELEV. ELE �'', / q �e E t; 'T'. s d 4 --, tI'-PC) �a 1iL-LB_10) ELEV. 1 19.3 13 1500 OAL ELEV. 131; 4gcv- ,- DRAIN .MOLE � / D-TsOdY � � � ^�� � ELEV. Z40 MIL POLY LINER ELEV. SEPTIC TANK ELE`V. PUH r CHECK VALVE % (�. `11"` 3f! 4�!��._ 24.75' ----> 103' x 2' DEEB WITH MYER CHAMBER Rif -4 2O.a9 STONE OF EL. V. � � TOP OF LNEF. =' 20..3 (5' OF STONE UNDER OR P,'IT.H tECI;ANICALL' COMPACTED) r U P. PULP ALARA ELEV.UNDER 19 �3 INFILTRATORS (STANDARD CHANBEIS) PACKAGE TO BE INSTALLED � ELEV. PITH 4' OF STONE AROUND SIDES ANI? TEE S'IZE'S': INDWELLING POWERED 3' AT NDS (24.75' x 1r x ?"DEEP) (H-20) INLET: '6" UP, 13" DOWN BY A CIRCUIT SEPARATE OUTLET: 5" UP, 14" DOWN F.OAf THE PUMP 4 POWER, (DISTANCE BETWEEN (CAS ..BAFFLE AT OUTLET TEE) ON/OFF SWITCH TO BE 3"). ADJUSTED CROUNDFf"AT.E'R ELEV. (USING 1.O') = 15.3 (DISTANCE BETWEEN ON S �IT^H BUOYANCY CALCULATION (SEPTIC TANK): kkD ALARM 27'0 BE 12") 10.5' z 5.6?" x (15.,3' - 13.5')'x 62.4 LB/CF = 6687 LES WEIGHT OF TANK = 11,480 LETS SITE /`± BUOYANCY CALCULATION (PUMP CHAMBE: ): � +J L � r ' 1�� � Y�� �T PLAN BEY: WEIGHT OF TANK � 8,240 LES � SSO�R LBS C�'f� G ( �- _. E�CISTING CONTOUR: 8.5' x 4,88` x 15.8 - 13,15' 62.4 LB CF s AP ROPED. BY: DATE: PROPOSED CONTOUR: - .E°XISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEV ATION: TEST .HOLE: UTILITY POLE: -0- FENCE LINE: --- HYDRANT: -6- RETAINING FALL: �� TREE; DEMA'REST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 02670 DM ®3� 3d.. PHONE & FAX : (508) 398-7710 L COCA TIO WEST YARMOUTH, MA PREPARED FOR j KEVIN BENGER j SCALE: I" - 20' DATE: B-4-03 I' REFERENCE: PLAN ROOF: 91 PAGE 41 OCT 2 8 2003 HEALTH DEPT. zf Df' t 3i r R.) -j, THOMAS McLELLAN, P.E.JOEtJV Z. DEMAREST JR., P.L.vj L COCA TIO WEST YARMOUTH, MA PREPARED FOR j KEVIN BENGER j SCALE: I" - 20' DATE: B-4-03 I' REFERENCE: PLAN ROOF: 91 PAGE 41 OCT 2 8 2003 HEALTH DEPT.