Loading...
HomeMy WebLinkAbout2014 Sep 05 - Email to David Coughanowr, Eco-Tech Environmental vonHone, Amy — i From: vonHone, Amy � 5ent: Friday, September 05, 2�14 4:02 PM To: davidcou@hatmaii.com '� SubJect: 11 Tabor Road Hi dave- � I have reviewed the plan and have the follawing comments/revisions: � 1. Show an effluent fiiter in the tank outket because of the pump 1 2. The 2" pressure line, because af the depth of the pump chamber, shpuld be easily accessible without entering the chamber. Show the 2" iine with a 90 bend in#a the riser with a quick discannect. The line can exiY the riser or 94 back down into the chamber to exit the outlet opening. 3. Spec#he size of the weep hoie in the pump chamber. 4. Show s check vaive in the pump chamber i'rne. � 5. Specify that an electrical permit is needed for the pump system. � Call or ernail with questions. Thanks, Amy Amy L.von Hone, R.S.,C.H.O. j Assistant Health Directar � Yarmouth Heaith pepartment 1146 Route 28 , South Yarmouth, MA 02664 (0) 508-398-2231 X1241 {F}508-780-3472 avonhaneCc�yarmauth.ma.us 1