HomeMy WebLinkAbout2014 Sep 05 - Email to David Coughanowr, Eco-Tech Environmental vonHone, Amy —
i From: vonHone, Amy
� 5ent: Friday, September 05, 2�14 4:02 PM
To: davidcou@hatmaii.com
'� SubJect: 11 Tabor Road
Hi dave-
� I have reviewed the plan and have the follawing comments/revisions:
� 1. Show an effluent fiiter in the tank outket because of the pump
1
2. The 2" pressure line, because af the depth of the pump chamber, shpuld be easily accessible without
entering the chamber. Show the 2" iine with a 90 bend in#a the riser with a quick discannect. The line
can exiY the riser or 94 back down into the chamber to exit the outlet opening.
3. Spec#he size of the weep hoie in the pump chamber.
4. Show s check vaive in the pump chamber i'rne.
� 5. Specify that an electrical permit is needed for the pump system.
� Call or ernail with questions.
Thanks, Amy
Amy L.von Hone, R.S.,C.H.O.
j Assistant Health Directar
�
Yarmouth Heaith pepartment
1146 Route 28
, South Yarmouth, MA 02664
(0) 508-398-2231 X1241
{F}508-780-3472
avonhaneCc�yarmauth.ma.us
1