Loading...
HomeMy WebLinkAboutReview Checklists TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AMS LOT -S- Date of Subdivision Appro al Street aj� ,ClidGQ Zone of Contribution: In ut Village Commercial esi ential Owner: , a. 1z-,, Installer G ga Builder: Engineers N/A YES NO Date of soils exam and percolation test not older than 2 years. 4 feet of naturallv occurring pervious material, above water table(new construction) �. Foundation 2 feet above high point of fronting road for new construction. >. Water availability let -ter from Water Department for new construction. 3 i. Benchmark indicated and shown - NGVD if near wetlands. X 7. Building sewer does not exit center of house. �C i. Septic tank a minimum of 10 feet from house and deck. �. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. 7� 11. Leaching_a minimum of 150 feet from drinkina wells/25 feet from irrigation wells �{ 12. System meets all other setback requirements. 13. Uses adjustment for maximum hisah groundwater. 14. Leachin 4 -5 feet above ad'us ater a or bottom of test pit. 15. System not in top or subsoil A 5 foot remov 16. Proposed contours are suitable. 17. System meets slope requirements - min. 1/8", 1/4" preferred. 18 Svstem meets breakout requirements - peastone elevation carried out 15 feet minimum �( 19 Specified tee sizes are proper gas baffle on outlet tee X 20.'Sewage flow under 10 000 snd for parcel. 21. No garbage disposal 22. System adequately sized for its intended use. �C 23 Minimum 6" stone or mechanically compacted below the tank and d -box 24 Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pu= chamber. y 26. Pump system - 2" line weep hole, check valve, sanitary in d -box alarm on separate circuit. 27. Septic tank and pump chamber to be Factory wateQ2roofed. 28 Vent provided if leaching below 3 feet or under driveway or parking 29. Engineer to inspect and certify : a clay removal b. wall construction schedule c. commercials stem 30. Enizineer and Land Surveyor stam and sip -nature. 31. H2O loadin T when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. 33. Foundation footiny.2 feet above adjusted water table. 34. Lot subdivided prior to July 31 1986 - Nitrate Loadin . 35. Subdivided prior co April 7 1989 - Phosphorus Zone 300'. Plan reviewed by: -�21