Loading...
HomeMy WebLinkAboutEngineered Plan - 1996GENERAL NO TES I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. J. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 4. ALL SEWER PIPE SHALL BE SCHEDULE 40 OR APPROVED EQUAL. 5. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. 1-800-322-4844 AND THE LOCAL WATER DEPT. FOR L OCA T I ON OF UNDERGROUND UTILITIES. 6. VERTICAL DATUM IS: ASSUMED 7. FOR BENCH MARKS SET. SEE SITE PLAN. 8. EXISTING CESSPOOL TO BE PUMPED DRY. REMOVED. BACKFILLED WITH SAND AND COMPACTED PRIOR TO PLACEMENT OF THE SEPTIC TANK. 9. ALL UNSUITABLE MATERIAL (FILL. E 4 B HORIZONS) ENCOUNTERED BELOW THE INVERT OF THE LEACHING FACILITY TO BE REMOVED FOR A DISTANCE OF 5' AROUND AND REPLACED WITH SAND IN ACCORDANCE WI TH TI TLE 5. EXIT 8 LOCUS MAP --1 GUE DRIVE MONTA LEACH PIT 100.29 BM -CAT( Rl •E 73.15' -- - N 83° 32 ' 23 3 -4 -XV FLOWDIFFUSOR W14* STONE AROUND DESIGN CRI TERIA: DESIGN FLOW: J BEDROOMS AT I 10 G. P. D. PER BEDROOM EQUALS 330 G. P. D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED 330 G.P.D. X 2009 - 660 GAL SEPTIC TANK PROVIDED: 1500 GAL. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE - { 5 MI N/I NCH SOIL TEXTURAL CLASS - 1 EFFLUENT LOADING RATE - 0. 74 GPD/SF _330 GPD / 0. 74 GPD/SF - 446 S. F. PROVIDED: 3-4'x 8' FLOWDIFFUSORS W14* STONE AROUND, A-472 S, F. SOIL TEST P I T DA TA &. INDICATES�_ INDICATES PERCOLATION -- OBSERVED TEST GROUND WA TER TP • I GRND EL. 103.4 G. W. EL. N/A 0. HORIZON TEXTURE COLOROTHER 103.4 FILL 1 8- .......................... ..................... .... 101.9 FINE I a YR SAND 5/I 23'............................................................ 101.5 B LOAMY 10 YR SAND 516 36........................................................:.... 100.4 C FIN -MED IOYR SAND 7/B 50' 120' 93.4 DATE: OCTOBER 3. 1996 TEST BY: STEPHEN HAAS WITNESSED BY PETER BRYANTON PERC RATE: ( 2 MIN/INCH S �P T / C SYS TEA- a ES / C3M /VDEPE/VDE-/vCE- DR / VE. MAP 67. PARCEL B2 12 WE- S T YA R "® U T1___1 M,4 ` PREPARED AOR .• M/ L DRE -0 MA Y/VA R D C_-,-`0 KE V / /V PA T TO/V . 6 WILL / AMS CO UR T' SOMMERV/LLE. MA 02/4.3 SCAL E: / - 20' OCTOBER .EA GL E' ,S" UR V, -Ir I NG 8t .E'NG I NE'.�'R I NG LNC X92 3 R� rlte 6'A O Yczr rrt®u the®r t IVA 6',;>,5 �5®�� 432-5333 ;'4 INVERT ELEVATIONS: ACCESS COVERS MUST BE WITHIN 9' MINIMUM. INVERT AT BUILDING: 102.0 04.92 6' of FINISH GRADE �3' MAXIMUM COVER INVERT IN SEPTIC TANK: 10/.75 FIRST 2� To BE LEVEL MIN 2' of PEASTONE INVERT OUT SEPTIC TANK: 101.5 4' PVC INVERT IN DIST. BOX: 101.25 SCHEDULE 40 o �r 3/4' - 1 lie' DIA. 98 4 WASHED STONE INVERT OUT DIST. BOX: 101.08 q� GA$ BAFFLE I .9 o oe 3-4 •x 8' FLOWDIFFUSORS INVERT IN LEACH CHAMBER: 99. 4 OUTLET W/4' STONE AROUND, I2'x 32' BOTTOM OF LEACH_ CHAMBER. 98. 4 lo' MIN. p p --I- 1500 GAL D -Box ADJUSTED GROUND WATER: N/A SEPTIC TANK 6' CRUSHED STONE BASE OBSERVED GROUND WATER: N/A BOTTOM OF TEST HOLE: 93.4 PROF I L E: NOT TO SCALE GUE DRIVE MONTA LEACH PIT 100.29 BM -CAT( Rl •E 73.15' -- - N 83° 32 ' 23 3 -4 -XV FLOWDIFFUSOR W14* STONE AROUND DESIGN CRI TERIA: DESIGN FLOW: J BEDROOMS AT I 10 G. P. D. PER BEDROOM EQUALS 330 G. P. D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED 330 G.P.D. X 2009 - 660 GAL SEPTIC TANK PROVIDED: 1500 GAL. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE - { 5 MI N/I NCH SOIL TEXTURAL CLASS - 1 EFFLUENT LOADING RATE - 0. 74 GPD/SF _330 GPD / 0. 74 GPD/SF - 446 S. F. PROVIDED: 3-4'x 8' FLOWDIFFUSORS W14* STONE AROUND, A-472 S, F. SOIL TEST P I T DA TA &. INDICATES�_ INDICATES PERCOLATION -- OBSERVED TEST GROUND WA TER TP • I GRND EL. 103.4 G. W. EL. N/A 0. HORIZON TEXTURE COLOROTHER 103.4 FILL 1 8- .......................... ..................... .... 101.9 FINE I a YR SAND 5/I 23'............................................................ 101.5 B LOAMY 10 YR SAND 516 36........................................................:.... 100.4 C FIN -MED IOYR SAND 7/B 50' 120' 93.4 DATE: OCTOBER 3. 1996 TEST BY: STEPHEN HAAS WITNESSED BY PETER BRYANTON PERC RATE: ( 2 MIN/INCH S �P T / C SYS TEA- a ES / C3M /VDEPE/VDE-/vCE- DR / VE. MAP 67. PARCEL B2 12 WE- S T YA R "® U T1___1 M,4 ` PREPARED AOR .• M/ L DRE -0 MA Y/VA R D C_-,-`0 KE V / /V PA T TO/V . 6 WILL / AMS CO UR T' SOMMERV/LLE. MA 02/4.3 SCAL E: / - 20' OCTOBER .EA GL E' ,S" UR V, -Ir I NG 8t .E'NG I NE'.�'R I NG LNC X92 3 R� rlte 6'A O Yczr rrt®u the®r t IVA 6',;>,5 �5®�� 432-5333 ;'4