Loading...
HomeMy WebLinkAboutEngineered Plans - Rev. 2014LOCUS DATA CURRENT OWNER REENA W. LEWIS PLAN REFERENCE 72-51 DEED REFERENCE 11224-67 ZONING DISTRICT R-25 FLOOD ZONE AE ASSESSORS MAP 42 PARCEL 180 OVERLAY DISTRICT NOT A ZONE II LOT AREA 9,812± S.F. UPLAND SITE & SEWAGE COMPONENT REPAIR ,732 BREEZ Y POIN T ROA D IN S. YARMOUTH, MASS DATE: NOVEMBER 7, 2014 REV: DECEMBER 13, 2014 OWNER/APPLICANT: C. BEMIS / R. LEWIS #5 JANNOR WAY WEST YARMOUTH MA 02673 SHEET 1 OF 3 PREPARED BY: EAS SURVEY, INC. P.O. BOX 1729 SANDWICH, MA 02563 PH. (508) 888-3619 CELL (508) 527-3600 EAS.SURVEY®YAHOO.COM DEC 1 I zo>a HEALT �N I LOT 10 PROPOSED 40 MIL POLY LINER —, BENCHMARK NAIL SET AT EDGE OF PAVEMENT ELEV. 9.02 NAD -88 IOBS ° PROPOSED NEW LEACHING FIELD I 20'x30' 1 , PROPOSED NEW H-20 DB -9 , 0 0 cRo V�E- sr. rail i 1�- QtRC D EXISTING 1,500 GALLON SEPTIC TANK TO REMAIN I I k 1 1� EXISTING PUMP CHAMBER TO REMAINCk ion .— of�I �1 � o x a PROPOSED 1.5' HIGH RETAINING WALL(S) I PROPOSED SILT FENCE ALONG EX. FENCE N 81.16' 0" E 276± BVW #6 701 4 I �� { ` BVW #5 107 I. EXISNG DRIV WAY I FUL BASE M NT EL= .2 BOUND FOUND HELD FOR LINE 28 a N ao Ci Z GROVE ST. a a LOCUS MAP NOT TO SCALE: LOT 11-12 9,812± S.F. ALO OF UPLAND \ BVW #s 1 \ DECK \ ~ BVW #3 a / / > / / / / / / / / . . r ' BVW #2 FULL BASEMENT ' EL=3.8 C -- O— BV�#1 ,t CONCRETE S 81.16,50„ W .290, g0 BOUNDFOUND ON LINE LOT I3 Sr 14-0131 Permit valid for REPAIR OF SEPTIC SYSTEM ONLY, due to State and Loca! septic variances. Board of Health review and approval is required for any future additions/renovations/alterations to sewage facilities and/or structures/dwelling. Yarmouth Health Department APPROVED L2)2� o�L3i Nine Date 0 20 30 40 GRAPHIC SCALE: 1 INCH = 20 FEET 45' SWEEP TO GRADE CLEANOUT WITH SCREW CAP ---i TOP OF FOUNDATION ELEV. 9.88 ELEV. 9.7 5' 4" PVC. SCI INV.= 7.53 EXISTING TO n REMAIN. JOB # 14-0131 EXISTING COVERS RISERS WITHIN 6" OF FINISH GRADE FINISH GRADE ELEV. 9.5 INV.=I- muv-� mrn ___ 7.25 10"TEE 14"TEE EXIST. ZABEL FILTER 4'-1" LIQUID. LEVEL EXISTING H-20 1,500 GALLON SEPTIC TANK TO REMAIN. "TEES" TO BE INSTALLED IF MISSING. SITE & SEWAGE COMPONENT REPAIR #J2 BREEZY POINT ROAD IN S. YARMOUTH, MASS DATE: NOVEMBER 7, 2014 REV: DECEMBER 13, 2014 OWNER/APPLICANT: C. BEMIS / R. LEWIS #5 JANNOR WAY WEST YARMOUTH MA 02673 SHEET 2 OF 3 -+ -0.015 SCH 40 7.00 EXIST. INV.= 6.45 EX. RIM GRADE RIM EL=9.45 i 333 GPD 'REVIOUSLY DESIC TEE" EXIST. ARM ON EL 6.08 IMP ON EL 5.75 4 - IMP OFF EL 4.82 RAISE COVER TO WITHIN 6" OF FINISH GRADE (2) OBSERVATION PORTS TO GRADE / SCREW ON CAP 2" TO 4" FINISH GRADE 0 CORNERS OF SAS EXPANDER ELEV. 11.3 ELEV. 10.7 GROUND ELEVATION 10.6 PUMP FOR 2' CONTROLS 9�. M N OF COVER TO REMAIN 8' 0S= 0.01 STONE FILL FOR H-20 LOADING TOP ELEV 9.80 SLOPE 0 0.005 8' 2" PVC SCH 409 OUTLETI H-20 DB9 7.455 NV INV.=9.70 EXIST. / HORIZ. "T" EXISTING PUMP CHAMBER (/ Y2 HP PUMP / H-20 MDC BASIN TO REMAIN PER DOWN CAPE ENG. 9-14-1995 PROPOSED 40 MIL POLY LINER TOP = 10.0 BOT = 7.5 1.) PRIOR TO STAKING OUT THE WALL THE FOOTING EXCAVATION AND LEACHING AREA SHALL BE INSPECTED. 2.) PRIOR TO THE INSTALLATION OF THE WALL THE STONE BED SHALL BE INSPECTED. 3.) PRIOR TO THE INSTALLATION OF THE LEACHING FIELD SYSTEM THE CLEAN FILL WILL BE INSPECTED TO CONFIRM A PERCOLATION RATE OF LESS THAN 2 MIN PER INCH. 4.) THE SYSTEM WILL BE INSPECTED AND THE PUMP WILL BE RUN PRIOR TO FINAL BACKFILL. PLEASE NOTE: EAS SURVEY REQUIRES 48 HOURS NOTICE TO PERFORM THESE INSPECTIONS IN A TIMELY MANNER. CERTIFICATION CANNOT BE COMPLETE WITHOUT INSPECTIONS. TYPICAL SECTION - WALL LESS THAN 4' HIGH. NOT TO SCALE: CAP STONE / CONCRETE ADHESIVE VERSA-LOK OR 10.61 APPROVED EQUAL °°°°°°°�����a °°°°°°°°°°°°°°°°°° INTERLOCKING WALL 4" 0 ' °' 000 ' ° ' ' 0 0 ' 0 ' ° STONE BACKFILL TO 1 8" MAINTAIN H-20 LOADING TIE ENDS & VENT IF REQUIRED 000 0000 eseo 0000 a eoo o eoo 0 oeo a eoe eo 0 : oe oe oe o0 oe oo eo oo eo eo oe oo o 0 ee o 0 ooe e ; 000 0000 0000 eeee 0 000 0 eee 0 000 0 000 oe 0 e ee ee oe oo ee oo o0.:**:: eo ee eo oo oe eo e e eee o 0a a 000 0000 0000 0 oee o eoo o eoo 0 Doe ee o e 20' x30' LEACHING FIELD (5) 4" SCH 40 PERF. PIPES (TIE ENDS) INV.= 9.53 INV.= 9.45 INV.= 9.30 I w •- - 30.0' _� a 40.0' - 20.0'x30.0LEACHING AREA / 27' X 40' STRIPOUT I ELEV. 4.7 ADJ. G.WATER TH#1 STRIPOUT TO "C" HORIZON PER 310 CMR 15.255 (C) 8.8 FILTER CLOTH +/OR 2" LAYER OF PEASTONE (DOUE(LE WASHED) OBSERVATION PORT / SCREW CAP STONE FILL TO GRADE TO MAINTAIN H-20 LOADING %" TO lY2" STONE (DOUBLE WASHED) 4' -�-- 4' - 1 4' --�-- 4'-- -• �•-2'-•� --- 20.0' - END VIEW TIE ENDS AND VENT IQ 0 DOSING CALCULATIONS: DESIGN FLOW TO CHAMBER = 440 GPD EL=9.8 EXISTING DESIGN TO REMAIN PREPARED BY: ° 0 ° EAS SURVEY,INC. EL=8.9 8" 40 MIL POLY LINER TOP 10.0 S.A.S. o°0 0 o e SEPTIC TANK BUOYANCY CALCULATIONS FILL 8" BOTTOM 7.5 a a o o EL= .8 EXISTING SEPTIC TANK TO REMAIN y e e e P. 0. B O X 1729 I 00:::::: STRIP OUT AREA SANDWICH, MA 02563 El =7.-R `°'°""'°'e6 310 CMR 15.255 (3) PUMP CHAMBER BUOYANCY CALCULATIONS PH. (508) 888-3619 BACKFILL REQUIRED EXISTING PUMP CHAMBER TO REMAIN CELL (508) 527-36005' 2' EAS.SURVEYQYAHOO.COM STONE LEVELING PAD GENERAL NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE V AND THE TOWN OF YARMOUTH RULES AND REGULATIONS FOR SUBSURFACE DISPOSAL OF SEWERAGE. 2. AT LEAST ONE ACCESS POINT OVER TANK TEES SHALL BE ACCESSIBLE WITHIN 3" OF FINISH GRADE, WITH ANY REMAINING ACCESS PORTS BROUGHT TO WITHIN 12" OF FINISH GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS OTHERWISE SPECIFIED. 4. THE EXCAVATION CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO ANY EXCAVATION. 5. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE OR WITHIN 6" OF GRADE SHALL BE MORTARED IN PLACE. 6. FINISH GRADE SHALL HAVE A MINIMUM OF 0.02 FEET PER FOOT OVER THE S.A.S. AND DISTRIBUTION BOX. 7. SEPTIC TANK SANITARY TEE'S SHALL BE CONSTRUCTED OF SCHEDULE 40 PVC AND SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOW LINE AND SHALL BE ON THE CENTERLINE AND LOCATED DIRECTLY UNDER THE CLEAN OUT MANHOLES. 8. THE INLET PIPE INVERT ELEVATION SHALL BE NO LESS THAN 2 INCHES NOR MORE THAN 3 INCHES ABOVE THE INVERT ELEVATION OF THE OUTLET PIPE. 9. THE SEPTIC TANK SHALL HAVE A MINIMUM COVER OF 9 INCHES 10. THE OUTLET SANITARY TEE SHALL BE EQUIPPED WITH A GAS BAFFLE, 4 INCHES IN DIAMETER AND CONSTRUCTED OF 4" PVC JOB # 14-0131 SITE & SEWAGE COMPONENT REPAIR IIJ2 BRBEZ Y POINT ROAD IN S. YARMOUTH, MASS DATE: NOVEMBER 7, 2014 REV: DECEMBER 13, 2014 OWNER/APPLICANT: C. BEMIS / R. LEWIS #5 JANNOR WAY WEST YARMOUTH MA 02673 SHEET 3 OF 3 PREPARED BY: EAS SURVEY, INC. P.O. BOX 1729 SANDWICH, MA 02563 PH. (508) 888-3619 CELL (508) 527-3600 EAS.SURVEY@YAHOO.COM 11. ALL PIPES SHALL BE SCHEDULE 40 PVC SEWER PIPE AND SHALL BE SLOPED 1/4 INCH PER FOOT MIN. EXCEPT FOR THE FIRST TWO FEET OUT OF THE DISTRIBUTION BOX WHICH SHALL BE LEVEL 12. CHANGES OR REVISIONS TO SEPTIC DESIGN REQUIRE NOTIFICATION TO EAS SURVEY INC. FOR B.O.H. AND DESIGN ENGINEERS REVIEW AND APPROVAL. 13. MAGNETIC TAPE ON ALL COMPONENTS. CONSTRUCTION NOTES: 1. CONTRACTORS / INSTALLERS SHALL VERIFY GRADES AND ELEVATIONS AND SITE CONDITIONS PRIOR TO COMMENCING WORK ON THE SITE. 2. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY, 3. VEHICULAR TRAFFIC, PARKING OF VEHICLES AND PLACING MATERIALS OVER THE SEPTIC TANK, DISTRIBUTION BOX AND S.A.S. AREA IS PROHIBITED VARIANCES REQUESTED TI TLE 5: 1.) TO ALLOW 4' OF SEPARATION TO GROUNDWATER IN LIEU OF 5'. 2.) TO ALLOW THE LEACHING AREA TO BE 4.6' FROM THE SLAB FLOOR INSTEAD OF 10' 3.) TO ALLOW THE LEACHING AREA TO BE 4.6' FROM THE CRAWL SPACE WALL IN LIEU OF 20'. 4.) TO ALLOW THE LEACHING AREA TO BE 2' FROM THE STREET LINE IN LIEU OF 10.' 5.) TO ALLOW THE LEACHING TO BE 7' FROM A PROPERTY LINE IN LIEU OF 10' 6.) TO ALLOW THE OVERDIG TO BE 2' WIDE ON STREET SIDE IN LIEU OF 5' 7.) TO ALLOW A 1' REDUCTION IN THE REQUIRED GROUNDWATER ADJUSTMENT. TOWN OF YARMOUTH: 1.) TO ALLOW THE LEACHING AREA TO BE 70' FROM THE WETLAND IN LIEU OF 100'. FLOOR LAYOUT BED#2 BH BED#3 LIVING ROOM BED#4 SECOND FLOOR DECK FAMILY ROOM BH BH KIT. DECK / KITCHEN FAMILY LIVING (\ /DINING ROOM ROOM SYSTEM DESIGN DESIGN FLOW 4 BEDROOMS AT 110 GPB/D 44-Q GPD 0.H #1 Q1 INDICATES DEEP TEST HOLE INDICATES EL.= 8.5 P-1 20" PERC TEST 54" INDICATES ADJ. GROUNDWATER � 78" HIGHEST OBS. WELL GROUNDWATER OBS. WELL EL.= 7.5 HIGH TIDE DATE: DEPTH ELEVATION OBS. TIME REQUIRED SEPTIC TANK (2 COMPARTMENT) 10-16-14 440 x_3 _ 1,320-_ GAL. ELEV. 2.7 SEPTIC TANK REQUIRED = _1,�00_GAL. 8:48 AM 9:04 PM EXISTING SEPTIC TANK = -_1 500 GAL. 74" ONE COMPARTMENT (PUMP CHAMBER IN LINE) 1:30 pm SIZE OF LEACHING FACILITY REQUIRED 10-18-14 DESIGN PERC RATE __ <2 ----MIN./INCH ELEV. 2.9 LONG TERM APPL. RATE_2•74-GPD/S.F. OjAOF�+' 440 _ 0.74 SF/GPD = 595 S.F. MIN. REQ. 82" ELEV. 2.4 DAV ��� SIZE OF LEACHING SYSTEM PROVIDED: m F ED R. t USING A 20' x 30' LEACHING FIELD 1 20' x 30' = 600 S.F �Fc/STi- ''Q 600 x 0.74 G/SF = 444 GPD S'gNIT RSP 444 GPD PROV > 440 GPD REQ. = 4 GPD RES. ' 'q NO (GARBAGE DISPOSAL / GRINDER ALLOWED) 0.H #1 Q1 INDICATES DEEP TEST HOLE INDICATES EL.= 8.5 P-1 20" PERC TEST 54" INDICATES ADJ. GROUNDWATER � 78" HIGHEST OBS. WELL GROUNDWATER OBS. WELL EL.= 7.5 HIGH TIDE DATE: DEPTH ELEVATION OBS. TIME 7:50 AM 8:05 PM 10-16-14 78" ELEV. 2.7 3:30 pm 8:48 AM 9:04 PM 10-17-14 74" ELEV. 3.0 1:30 pm 9:42 AM 9:59 PM 10-18-14 76" ELEV. 2.9 3:30 pm 1:17 AM 11:38 PM 82" ELEV. 2.4 noon X10-20-14 11:59 AM 12:00 AM 1A-21-14 83" ELEV. 2.3 1:00 pm J:EBED #1�N���s FIRST FLOOR GROUNDWATER ADJUSTMENT DATE OF WELL: 10/14 INDEX WELL: MIW-29 WELL ZONE: A WELL DEPTH: 9.71 DEPTH OF WATER: 6.2' WELL ADJUSTMENT: 2.7' 1' OFF ADJUSTMENT 1.7'* DEPTH OF ADJ.: 4.5' EL.= 4.7 EL.= 3.0 EL.= 2.7 D.T.H. #1 i DATE: 10-16-14 GROUND ELEV. 9.2 ADJ. GROUNDWATER 4.7 A LOAMY SAND 10YR 4/3 B LOAMY SAND 7.5YR 5/8 C-1 MEDIUM SAND 10YR 5/6 C-2 MEDIUM SAND 2.5Y 7/4 OBS WELL El 20" 54" 74" 78" B.O.H. PHIL RENAUD SOIL EVALUATOR ED. STONE BACKHOE OPERATOR. NONE - AUGUR HOLE SOIL TYPE: 1_ PERC RATE: <2 MIN. PER INCH LOADING RATE: 0_74 GAL/SF/MIN