Loading...
HomeMy WebLinkAboutEngineered Plan - 2005 - VOIDEDi f. I 1 PERCOLATION TEST Date of Percolation Test: MARCH 24, 2005 Test Performed By. CARMEN E. SHAY, R.S., C.S.E. Results Witnessed By. BRUCE MURPHY ( YARMOUTH B.O.H.) Excavator: SHAY ENVIRONMENTAL SERVICES, INC. i Percolation Rate: Less Than 2 MPI 0 28" I i I { Test Hole No. 1 DEPTH SOILS ELEV. 0 52.40 FILL I 0"-18" 50.90 Sandy Loom 10 YR 3/2 I 18"-24 Ae 50.40 I Loamy Sand 10 YR 5/6 1 24"- 48' B 148.40 Medium Sand 2.5 Y 7/4 ! 48"- 84" C, 45.40 Medium Sand 2.5 Y 8/2 !I 84"- 96' C 44.40 Perc #1 Depth to Perc: 48" to 66" Perc Rate= Less Than 2 MPI MIW29/ZONE B - INDEX = 7.1 for 3/05 ADJUSTMENT = 1.4 FEET OBSERVED H2O Elev. = 72" or 6' below Grade ADJUSTED H2O Elev. = 4.6' below Grade per Frimpter 1 I I BUOANCY CALCULATIONS e/g o a � p , • No Ballast Required For Pump Chamber r i III Design Calculation - - 1`4 mber of Bedrooms: 4 Equivalent to 440 Gal./Day (440 goL/day per Title V) Garbage Grinder: No �.�� LIPaching Capacity Real red: 330 Gal./Day Minimum Title V ) \ ' eptic Tank - 2 x 440 Gal./Day = E SE NEW 1,500 GAL. Septic Tank. OIL ABSORPTION AREA: Using percolation rate of <2 min./Inch Bottom Area: 0.74 gal/sq. ft. x 600 sq. ft. = 444 gallons V e.;'� V v Sidewall Area: NOT USED �fy � Providing: = 444 gallons EACH FIELD DIMENSIONS: 15' WIDE by 40' LONG II ) FNGINEER's INSPECTION INSPECTION SCHEDULEEDULE EXISTING TANK & LJACH PIT TO BE PUMPED DRY & THE PROPERTY LINES ARE APPROXIMATE AND I Inspection #1: Engineer shall inspect when the required excavation is complete. FILLED IN PLACE COMPILED FROM THE SURVEY PLAN ENTITLED 0 20 40 50 Inspection #2: Engineer shall inspect when clean fill with percolation NOTE: THE STRIPPE� OUT SOIL CONTAINING LEACHATE DATED' PLAN OF LAND - YARMOUTH, MA ;.., Rate of less than two minutes per inch has been properly deposited. DATED FEBRUARY 10, 1959 - PLAN #17149-G FROM THE EXISTING SEPTIC SYSTEM TO BE DISPOSED ( AND IS NOT INTENDED TO BE A SURVEY PLOT PLAT: Inspection #3: Engineer shall inspect when components of the septic IT SHOULD BE USED FOR NO PURPOSE OTHER THAN System and the pump chamber mechanisms have been Installed. ITHE SEPTIC SYSTEM INSTALLATION. OF AS PER BOARD 0;= HEALTH SPECIFICATIONS, SCALE: 1 = 20' I 1 ;aT c q LEGEND EI V P R 0 E! L- E OF SEPTIC SYSTEM : I:•t rLsrt -� 88XO DENOTES PROPOSED rl ° r NOTE: BREAKOUT ELEVATION OF LEACH FIELD Top of Peostone or Elevation 53.50 r I'f SPOT GRADE U LINER TO EXTEND 6" MINIMUM ABOVE BREAKOUT ELEVATION t1 DENOTES EXISTING _ 104X46 SPOT GRADE S Ches�e R�tra PL r Finished rade over s stem=2% slope away �.__., PROPERTY LINE "NOTE: INSTALL TUF-TITE GAS BAFFLES OR EQUALS ON ALL OUTLET TEE ENDS. 9 Y P y71 Prov,de Risers f cover Finished 9 y , 4 +1 �'' M f1 F'�`�. PROPOSED CONTOUR to Finished rade overs stem= 54.25 t; �•1 within 6 of finished rade r oL , I : DBOX 9 I `�'` 4,, ,•4 ff. 97- - - - - -97 EXISTING CONTOUR -10' min. from Provide Risers NEW' House house to septic tank I Provide Risers if necessary to bring INLET Pump Chamber cover` t, - �, 4, { t th' � L 1500 GALLON H-20 SEPTIC TANK. ,NOT TO SCALE NOTE: TANK, AND PUMP CHAMEER TO BE FACTORY WATERPROFFED PRIOR TO SHIPPING. I 3-24' DIAM. ACCESS MANHOLES 3-24' REMOVABLE COVERS , f r. �, - --'i I _3' min. clearance Ai �., INLET �8"-mhn Ej,2_ min. inlet to outlet 8" n °D Liquid level- 1 •1 I ��. i tom1 . I 14' F INLET/ \ ' \ / ,)•, OU ET 'J,j p STEEL REINFORCED PRECAST CONCRETE PLAN VIEW CROSS SECTION i SEPTIC TANK SHALL BE FACTORY CONSTRUCTED OF SOUND DURABLE WATERTIGHT MATERIAL AS PER TITLE V CODE 15.226.: CENTER ACCESS COVER OF SEPTIC TANK TO BE RAISED WITH THE APPROPRIATE RISER TO WITHIN 6' OF THE EXISTING GRADE AS PER TITLE V. THE ACCESS COVERS FOR THE SEPTIC TANK, DISTRIBUTION BOX AND LEACHING COMPONENT SET DEEPER THAN I FOOT BELOW FINISHED GRADE SHALL BE RAISED TO WITHIN 12' OF FINISHED GRADE. INSTALL TUF-TITE GAS BAFFLES OR EQUALS ON ALL OUTLET TEE ENDS I f jt3• _..�nr-. INLET , OUTLET 'I TI �f 5, -7" I 4'-0' min.. Ligiuld depth 1 5' -8" END -SECTION I j ALL OUTLET PIPES FROM THE DISTRIBUTION BOX SHALL BE - 12" - ON COVER SET LEVEL FOR AT LEAST 2 FT. I I t 1 6 - 5" OUTLET T- `v I KNOCKOUTS ' - 15.5"- - I 12• INLET OUTLET I- -'t g g' 1.75" I PI AN -SECTION CROSS SECTION 3 HOLE H-10 DISTRIBUTION BOX NOT TO SCALE , i 2-20" REMOVEABLE MANHOLE COVERS WITHIN 6' OF FINISHED GRADE. I I RESTORE TO FINISHED GRADEIELEV. NLET UFT OUT CHAIN (8FF INLET INVERT 'I FLF�.��Q,4 •, - _ Lull_ ET REWEINVERT ELEV.- 50.20 3/' �E CHECK VALVE E PPHOLE ABOROTECTION 2-20• NAY. ACCESS MANHOLES I 1 1 1 1--2" SWING CHECK VALVE-P.V.C. STEEL REINFORCED PRECAST CONCRETE PUMP CHAMBER ELEV.- 46.20 PUMP DETAIL, Not to Scale u I PUMP NOTES & SPEG,VEICA TIONS 1. PUMP SHALL BE INSTALLED IN STRICT COMPLIANCE WITH MANUFACTURER'S SPEC/F7CA77ONS. 2. ALARM SHALL CONSIST OF AUDIBL�i SIGNAL 6r RED WARNING LIGHT TO BE INSTAL :ED W BUILDING AND POWERED BY SEPARATE CIRCI'7 FROM - C/RCUITS TO PUMP. 3. DOSING SCHEDULE' l 440 G4LLONS/4 DOSES=! 10 Gari O)NS/DOSE 11 ,i FLOA T LOCA TION CALCULATIONS 170 GCdonS / 7.48 GAL./Cu Ft = 14.70 Cu Ft Arco of Bottom of Chamber = 8' x 5• = 40 .Sq. Ft. Height of Water for One Dose (H) = %4.7 Cu.II Ft. / 40 Sq Ft. H = 0.37 Ft. = 4.40" Pump On - Pump Off = 5" Alarm = 22.0' I 40 OUTLET THE ACCESS COVERS FOR THE SEPTIC TANK, DISTRIBUTION BOX AND LEACHING COMPONENT SET DEEPER THAN 6" BELOW FINISHED GRADE SHALL BE RAISED TO WITHIN 6' OF FINISHED GRADE. PLAN VIEW Weight of Septic Tank: 21,230 lbs. I I Weight of Soil Above Tank 4,166 lbs. l To tol Weight Down: 25,3 96 lbs. •: •,, Weight of Water Displaced: 6,966 lbs. 3 mh d•v LET W.t e` mti_[_L2 mr. w .t to _wt OUTLET No Bollost Required For Septic Tank 1 �-'� Weight of Pump Chamber: 14,500 lbs. t a' A r , 4� i l Weight of Soil Above Tank 3,333 lbs. PERCOLATION TEST LOCATION Tota/ Weight Down: 17,833 lbs. S' ' IA/ ht f W ter D's laced 6 336 lbs e/g o a � p , • No Ballast Required For Pump Chamber r i III Design Calculation - - 1`4 mber of Bedrooms: 4 Equivalent to 440 Gal./Day (440 goL/day per Title V) Garbage Grinder: No �.�� LIPaching Capacity Real red: 330 Gal./Day Minimum Title V ) \ ' eptic Tank - 2 x 440 Gal./Day = E SE NEW 1,500 GAL. Septic Tank. OIL ABSORPTION AREA: Using percolation rate of <2 min./Inch Bottom Area: 0.74 gal/sq. ft. x 600 sq. ft. = 444 gallons V e.;'� V v Sidewall Area: NOT USED �fy � Providing: = 444 gallons EACH FIELD DIMENSIONS: 15' WIDE by 40' LONG II ) FNGINEER's INSPECTION INSPECTION SCHEDULEEDULE EXISTING TANK & LJACH PIT TO BE PUMPED DRY & THE PROPERTY LINES ARE APPROXIMATE AND I Inspection #1: Engineer shall inspect when the required excavation is complete. FILLED IN PLACE COMPILED FROM THE SURVEY PLAN ENTITLED 0 20 40 50 Inspection #2: Engineer shall inspect when clean fill with percolation NOTE: THE STRIPPE� OUT SOIL CONTAINING LEACHATE DATED' PLAN OF LAND - YARMOUTH, MA ;.., Rate of less than two minutes per inch has been properly deposited. DATED FEBRUARY 10, 1959 - PLAN #17149-G FROM THE EXISTING SEPTIC SYSTEM TO BE DISPOSED ( AND IS NOT INTENDED TO BE A SURVEY PLOT PLAT: Inspection #3: Engineer shall inspect when components of the septic IT SHOULD BE USED FOR NO PURPOSE OTHER THAN System and the pump chamber mechanisms have been Installed. ITHE SEPTIC SYSTEM INSTALLATION. OF AS PER BOARD 0;= HEALTH SPECIFICATIONS, SCALE: 1 = 20' I 1 ;aT c q LEGEND EI V P R 0 E! L- E OF SEPTIC SYSTEM : I:•t rLsrt -� 88XO DENOTES PROPOSED rl ° r NOTE: BREAKOUT ELEVATION OF LEACH FIELD Top of Peostone or Elevation 53.50 r I'f SPOT GRADE U LINER TO EXTEND 6" MINIMUM ABOVE BREAKOUT ELEVATION t1 DENOTES EXISTING _ 104X46 SPOT GRADE S Ches�e R�tra PL r Finished rade over s stem=2% slope away �.__., PROPERTY LINE "NOTE: INSTALL TUF-TITE GAS BAFFLES OR EQUALS ON ALL OUTLET TEE ENDS. 9 Y P y71 Prov,de Risers f cover Finished 9 y , 4 +1 �'' M f1 F'�`�. PROPOSED CONTOUR to Finished rade overs stem= 54.25 t; �•1 within 6 of finished rade r oL , I : DBOX 9 I `�'` 4,, ,•4 ff. 97- - - - - -97 EXISTING CONTOUR -10' min. from Provide Risers NEW' House house to septic tank I Provide Risers if necessary to bring INLET Pump Chamber cover` t, - �, 4, { t th' � L 1500 GALLON H-20 SEPTIC TANK. ,NOT TO SCALE NOTE: TANK, AND PUMP CHAMEER TO BE FACTORY WATERPROFFED PRIOR TO SHIPPING. I 3-24' DIAM. ACCESS MANHOLES 3-24' REMOVABLE COVERS , f r. �, - --'i I _3' min. clearance Ai �., INLET �8"-mhn Ej,2_ min. inlet to outlet 8" n °D Liquid level- 1 •1 I ��. i tom1 . I 14' F INLET/ \ ' \ / ,)•, OU ET 'J,j p STEEL REINFORCED PRECAST CONCRETE PLAN VIEW CROSS SECTION i SEPTIC TANK SHALL BE FACTORY CONSTRUCTED OF SOUND DURABLE WATERTIGHT MATERIAL AS PER TITLE V CODE 15.226.: CENTER ACCESS COVER OF SEPTIC TANK TO BE RAISED WITH THE APPROPRIATE RISER TO WITHIN 6' OF THE EXISTING GRADE AS PER TITLE V. THE ACCESS COVERS FOR THE SEPTIC TANK, DISTRIBUTION BOX AND LEACHING COMPONENT SET DEEPER THAN I FOOT BELOW FINISHED GRADE SHALL BE RAISED TO WITHIN 12' OF FINISHED GRADE. INSTALL TUF-TITE GAS BAFFLES OR EQUALS ON ALL OUTLET TEE ENDS I f jt3• _..�nr-. INLET , OUTLET 'I TI �f 5, -7" I 4'-0' min.. Ligiuld depth 1 5' -8" END -SECTION I j ALL OUTLET PIPES FROM THE DISTRIBUTION BOX SHALL BE - 12" - ON COVER SET LEVEL FOR AT LEAST 2 FT. I I t 1 6 - 5" OUTLET T- `v I KNOCKOUTS ' - 15.5"- - I 12• INLET OUTLET I- -'t g g' 1.75" I PI AN -SECTION CROSS SECTION 3 HOLE H-10 DISTRIBUTION BOX NOT TO SCALE , i 2-20" REMOVEABLE MANHOLE COVERS WITHIN 6' OF FINISHED GRADE. I I RESTORE TO FINISHED GRADEIELEV. NLET UFT OUT CHAIN (8FF INLET INVERT 'I FLF�.��Q,4 •, - _ Lull_ ET REWEINVERT ELEV.- 50.20 3/' �E CHECK VALVE E PPHOLE ABOROTECTION 2-20• NAY. ACCESS MANHOLES I 1 1 1 1--2" SWING CHECK VALVE-P.V.C. STEEL REINFORCED PRECAST CONCRETE PUMP CHAMBER ELEV.- 46.20 PUMP DETAIL, Not to Scale u I PUMP NOTES & SPEG,VEICA TIONS 1. PUMP SHALL BE INSTALLED IN STRICT COMPLIANCE WITH MANUFACTURER'S SPEC/F7CA77ONS. 2. ALARM SHALL CONSIST OF AUDIBL�i SIGNAL 6r RED WARNING LIGHT TO BE INSTAL :ED W BUILDING AND POWERED BY SEPARATE CIRCI'7 FROM - C/RCUITS TO PUMP. 3. DOSING SCHEDULE' l 440 G4LLONS/4 DOSES=! 10 Gari O)NS/DOSE 11 ,i FLOA T LOCA TION CALCULATIONS 170 GCdonS / 7.48 GAL./Cu Ft = 14.70 Cu Ft Arco of Bottom of Chamber = 8' x 5• = 40 .Sq. Ft. Height of Water for One Dose (H) = %4.7 Cu.II Ft. / 40 Sq Ft. H = 0.37 Ft. = 4.40" Pump On - Pump Off = 5" Alarm = 22.0' I 40 OUTLET THE ACCESS COVERS FOR THE SEPTIC TANK, DISTRIBUTION BOX AND LEACHING COMPONENT SET DEEPER THAN 6" BELOW FINISHED GRADE SHALL BE RAISED TO WITHIN 6' OF FINISHED GRADE. PLAN VIEW ` 3-24• REMOVABLE OOVERS }- _ Y I f G { �- t.y •: •,, •. 3 mh d•v LET W.t e` mti_[_L2 mr. w .t to _wt OUTLET � , • 1 �-'� r`(� 1<' t a' A r , 4� i l x.34 ti .^r YI'". PERCOLATION TEST LOCATION S' ' �a Pefoated P.V.C. r -2" -v8• -v2" Washed *. r �us CROSS-SECTiON END -SECTION 1000 GALLON H-20 SEPTIC TANK USED AS PUMP CHAMBER NOT TO SCALE STOCKADE FENCE Ca acit - G.P.M. P Y NOTE: TANK & PUMP CHAMBER TO BE FACTORY WATERPROFFED PRIOR TO SHIPPING. o t • .^ • 3/4'-Ik" Woehed Stone PUMP SPECIFICA TION CAL COLA TIONS 52.70 S A ryC HEAD CALCULA n0,'v 53.1? - Eley of D -Box In 46.20' - Elevation of Bottom of Pump Chamber 53.17 - 46.20' = 6.97' Static Head DYNAMIC HEAD Friction Head For 3' SCH 40 PVC Pipe 010 CPM - 0.005 Ft./100 Ft Use Gould Model- 3887(WS05118F) Pu.mr ®50 GPM - 0.01 Ft./100 Ft. 230 Volt Phase I 0100 GPM - 0.40 Ft./100 Ft. 1/2 HP 2' Solids Honddng Total Dynamic Head = 7.37' O 100 GPM I -- OR EOUNALENT PUMP PERFORMANCE DA TA i I I i I I I I I ' I I I I � I I i I'I i i I ! to bring Septic tank covers to grade and outlet cover o wi iIn within 6" of finished rade 9 6" finished ` TOP OF SYSTEM = 53.50 J _ +' y - ','is f G { �- t.y LEEP TEST H L 0 2p 40 60 80 100 120 1 40 of grade '.C`i/8 per foot 5-005 1 �-'� r`(� 1<' t a' A r , 4� i l x.34 ti .^r YI'". PERCOLATION TEST LOCATION S' ' �a Pefoated P.V.C. r -2" -v8• -v2" Washed �us � S Level for 2' Invert Eev.I-52.90,/! s STOCKADE FENCE Ca acit - G.P.M. P Y - 1�4. per fa I S. I GE tlA1N ! o t • .^ • 3/4'-Ik" Woehed Stone ;" Bettom of Leac� Facilit le .= 52.70 B' M F.�daEY y�' ,z,t�Kt4k1ti1E ! Per toot' FOR i� �•., '.� ` •.I,: °•r: ,. , - NEV PIPETPJ GENERAL NOTES 1. Contractor is responsible for Digsofe notification and protection of all underground utilities and pipes. 2. The septic tank and distribution box shall be set level on 6" of 3/4"-1 1/2' stone. 3. Backfill should be clean sand or gravel with no stones over 3" in size. 4. This system is subject to inspection during installation by CARMEN E. SHAY - Environmental 5. The contractor shall install this system in accordance with Title V of the Massachusetts state code, the approved plan and Local Regulations. 6. if, during installation the contractor encounters any soil conditions or site conditions that are different from those shown on the soil log or in our design _ installation must halt & immediate notificFo made to CARMEN E. SHAY �-mss irvr,.efital 7. No vehicle or heavy machinery shall drive o r the ` septic system unless noted as H-20 septi _, mponents. 8. Install Tuf-Tite gas baffles or equals on al `� u et tee ends. 9. All Distribution Lines shall be 4" diameter c ed le 40 NSF PVC pipe 10. All solid piping, tees & fittin II be 4' di eter Schedule 40 NSF PVC pipes t ith water ig t jo, s. 1. Municipal Water i Available. 1 a�C� OMCD • `i(111�"i LROM EXIST. o ! 2 10 1n `n yb .',,.__STR POUT ALL AROUND�V1 Adjusted ESHWT ELEVA11ON = 47.20t-/ LTH C <" Sch 40 PYC�O O •� u I - 1i Bo m -o est Hole i Elee,=PT0 NtSt,l �C TANK QN r'5 11 . •... . - •.PRcv1� O `� 1000 GAiLON I s' Sch 4o Pv > yFOUNDA?I N-� nl(o>I o PUMP CHAM ca N -1----- ------------------------------------ ---- ---- -�J\ //�AcoNCREr FGutiDAT+oN- I u! h 20 r I H-20 1 ; Groundwo er - Test Hole 1 Elev.= 46.80 �Adj. Per CAPE COD COM SION = ELE4'. 48 0) I' E OI S! OR S REPAREP EORT ruL' FouN"A oN >II I ECT ADJ Groundwater = ELEV. 48.20 - 1 per Yarmouth BOH = 47.20 I e �; y m 4 L0 c - I OF /4"-i'/2" STONE N h 6' OF 3/4"-11/2" STONE a6 6 6" OF 3/4"-11/2" STONE �I I c>I c Note: Remove soil down to mad - coarse sand layer replace with ! O Dal I ` • DEFINITION PUMP CHAMBER c (elev. 48.00 Estimated) & replace with clean coarse sand w/perc. ySTE-V PROFILE - rate less than or equal to 2 minjin. before dt after placement Note: All leach lines to be copped at ends w/PVC cops. T NOTE: LICENSED PLUMBER & PERMIT REQUIRED TO PERFORM INSIDE PLUMBING WORK I NOTE: TANK AND PUMP CHAMBER TO BE FACTORY WATERPROFFED PRIOR TO SHIPPING.! i NO TANK AND PUMP CHAMBER TO BE HAVE BOOTS CAST IN PLACE AT FACTORY. S-6" on center LEACH FIELD CROSS-SECTION 4'-0" on center 4'-0" on center S-6" on center AN I Oi\�10 CHAS, ES 15126 BRIAR RIDGE CIRCLE FT MEYERS 'FLORIDA 3391 2-2301 ,� pF IV'A`SS a�Gl►„BERT 9c � No 2t3i�L ; > c ,1U� SUBSURFACE SEV�AGE DISPOSAL_ YSTEM OF 1� #1 1131 CHESHIRE ROAD `"YARMOUTH, MA SCALE: 1 "=20' PROJECT#SD-7238 !PREPARED PY: CAE. ,5'HA Y ENVIRONMENTAL SERVICES, INC. 34 THATCHERS LANE EAST FALMOUTH, MA 02536 TEL/FAX : 508-548-0796 DRAWN BY: CES DATE: APRIL 15, 2005 'ILENAME: SD723BPP.DWG SHEET 1 OF 1