HomeMy WebLinkAbout2008 Feb 20 - Email to "Jim"; MessageJim
I visited the Bass River Food Concession today, to view the renovations.
Please call me, so we can meet in the Health Department to discuss the renovations. Lets try to
meet tomorrow Thursday.
It appears a new floor in the kitchen area is needed. The last floor that was installed is not a
smooth surface.
The kitchen ceiling tiles need to be replaced with washable tiles.
The walls must have a smooth surface, such as marlite or smooth white board.
The floor in the new bar must also be a smooth surface.
You must check with the building department if the new turbo counter top cooking units must be
under a hood.
A plumbing permit will be needed for the new 3 bay sink and dishwasher behind the new bar, and
for relocating the kitchen 3 bay sink.
A floor plan and kitchen equipment listing plan should have been submitted for review to the
Health Dept. prior to any kitchen renovations.
Is outdoor seating or serving of alcohol proposed?
What would be the seating count?
Bruce
2/20/08
rr�rr�s-
Of
Q'
Phone �C��a
FAX Area Code
MOBILE
Number Extension
Area Code
Number /, Extension
Telephoned
Returned your call USH
Came to see you
Please call Special attention
Wants to see you
Will call again Caller on hold
Message
48023