Loading...
HomeMy WebLinkAbout2008 Feb 20 - Email to "Jim"; MessageJim I visited the Bass River Food Concession today, to view the renovations. Please call me, so we can meet in the Health Department to discuss the renovations. Lets try to meet tomorrow Thursday. It appears a new floor in the kitchen area is needed. The last floor that was installed is not a smooth surface. The kitchen ceiling tiles need to be replaced with washable tiles. The walls must have a smooth surface, such as marlite or smooth white board. The floor in the new bar must also be a smooth surface. You must check with the building department if the new turbo counter top cooking units must be under a hood. A plumbing permit will be needed for the new 3 bay sink and dishwasher behind the new bar, and for relocating the kitchen 3 bay sink. A floor plan and kitchen equipment listing plan should have been submitted for review to the Health Dept. prior to any kitchen renovations. Is outdoor seating or serving of alcohol proposed? What would be the seating count? Bruce 2/20/08 rr�rr�s- Of Q' Phone �C��a FAX Area Code MOBILE Number Extension Area Code Number /, Extension Telephoned Returned your call USH Came to see you Please call Special attention Wants to see you Will call again Caller on hold Message 48023