HomeMy WebLinkAbout2002 Jul 03 - Letter from Coastal Engineering Re: Quarterly Groundwater Monitoring July 3,2002 C15667.00
�
Bruce G.Murphy � � � (� Q 1� (� �
Yarmouth Boazd of Health
1146 Route 28 ,j�� � 8 Z�OZ
South Yarmouth,MA 02664
HEALTH DEPT.
RE: 99 Restaurant
14 Berry Ave.,West Yarmouth
Quarterly Groundwater Monitoring
� Dear Mc Murphy:
: Enclosed please find the results of the recenfly completed quarterly groundwater monitoring
for the FAST system at the above referenced site. Included in this report is a sheet
summarizing the analytical results,the laboratory data sheets and a copy of the site p]an
' prepazed by Down Cape Engineering Co., which shows the monitoring well locations. This
plan has been edited to highlight the well arrangement and locations.
Each of the wells was gauged prior to sampling. Using an electric submersible purge pump
��' at least three volumes of water were removed from each well. New,dedicated bailers were
then used to collect samples from the wells. The samples were picked up by a courier from
� the laboratory and transported to the laboratory the same day.
Sampling will continue on a quarterly basis. The next sample event will be conducted in
September 2002. Do not hesitate to contact us if you have any queseons regazding this
report.
Very truly yours,
COASTAL ENGINEERING CO., INC.
�OGtGI �` f��it�,e�(
�; Todd J.Palmatier, hydrogeologist
TJP/dlb
enclosures
cc: Jim Kiley, 99 Restaurant
ix
.e"A^. .
„ . �,
- . .. . . . . D:�DOQCI5600�I566Nune02Report_7-3-02.doc