Loading...
HomeMy WebLinkAboutEngineered Plan - 2002BENCH MARK: TOP OF FND. ELE.= 31.0 2x 29.0 ' 28.8 NEW 1,500 GAL 0 6' CRUSHED STONE 10't SOIL TEST LOG PERC RATE- < 2 MIN/INCH DEPTH 0 ELEV.= 30.0 A LOAMY SAND 10YR 4/2 8' 8 LOAMY SAND 1OYR 6/6 24' J11 0 Cl MEDIUM SAND 10YR 7/4 125" 9.58 SOIL TEST CONDUCTED ON MARCH 7, 2002 BY HUNTER ENGINEERING ASSOC. WITNESSED BY: AMY VON HONE, AGENT YARMOUTH HEALTH DEPARTMENT PERC BOTTOM O 38' LEGEND: EXISTING CONTOUR -------- WATER SERVICE W—W— TEST HOLE 10 GAS SERVICE G—G BENCH MARK F, HM MANHOLE COVERS TO EXTEND TO WITHIN 6' OF FINISH GRADE AS BAFFLE REQ'D ` 7.DX W D. 183. r (SAS) SHALL BE 45.75' LONG 11.0' WIDE s 10" DEEP 6; EL=28.50 0 28.03- 8 _ 5. 6• USHER ONE _- - -_ c EL=27.16 MIN. 1.0 4375 0' PROPOSED SEPTIC SYSTEM NO SCALE NOTE: PRIOR TO INSTALLING THE NEW (SAS) THE CONTRACTOR SHALL PUMPOUT ALL CESSPOOLS AND BACK FILL WITH CLEAN MEDIUM SAND IF CESSPOOLS ARE FOUND WITHIN THE NEW (SAS) AREA THEY SHALL BE REMOVED REQUESTED VARIANCE: 1) REQUEST A 5' VARIANCE FOR SEPARATION (SAS) AND PROPERTY LINE 2) REQUEST A 2' VARIANCE FOR SEPARATION (SAS) AND FOUNDATION WALL USE SEVEN (7) INFILTRATORS WITH 4.0' OF STONE 0 SIDES do 1.0' OF STONE ® ENDS NO STONE AT BOTTOM PEASTONE TOPPING ENDS .3/4' DOUBLE WASHED STONE ALL AROUND 28 Al 5'-1\ 123.13' �I \, I Qj - Sp ort LIrv, 29.80 'O i 18' I I 45' o 00 25' 1 LL1 n N TOP FND=31.0 CN Z 00I Q �1 �1 T 25. 26' I I c�0 0 InCOi t 3 % MAR 1 1 2002 ------ O --- = HEALTFI DEPT. 91.36' of MA „G ROBS q�y \� Or JOHN P. � HUNT LONG POND DRIVE ER � CIVIL orF p Ec ��a No. 36445 ®� ss fST a � A( PLAN 1" = 30' LOCUS MAP GENERAL NOTES: — ELEVATIONS SHOWN BASED ON U.S.G.S. DATUM. SYSTEM PIPE SHALL BE EITHER C.I. OR SCHEDULE 40 P.V.C. — THE BOARD OF HEALTH SHALL BE NOTIFIED PRIOR TO BACKFILLING OF SEPTIC SYSTEM. — SEPTIC SYSTEM STRUCTURAL COMPONENTS SHALL BE CAPABLE OF WITHS1AdNDING A H-10 LOADING, UNLESS SPECIFIED OTHERWISE — SEPTIC SYSTEM UNDER DRIVEWAYS SHALL COMPLY WITH A H-20 LOADING. — THE DESIGN AND COMPONENTS OF THE SEPTIC 5'-1\ 123.13' �I \, I Qj - Sp ort LIrv, 29.80 'O i 18' I I 45' o 00 25' 1 LL1 n N TOP FND=31.0 CN Z 00I Q �1 �1 T 25. 26' I I c�0 0 InCOi t 3 % MAR 1 1 2002 ------ O --- = HEALTFI DEPT. 91.36' of MA „G ROBS q�y \� Or JOHN P. � HUNT LONG POND DRIVE ER � CIVIL orF p Ec ��a No. 36445 ®� ss fST a � A( PLAN 1" = 30' LOCUS MAP GENERAL NOTES: — ELEVATIONS SHOWN BASED ON U.S.G.S. DATUM. SYSTEM PIPE SHALL BE EITHER C.I. OR SCHEDULE 40 P.V.C. — THE BOARD OF HEALTH SHALL BE NOTIFIED PRIOR TO BACKFILLING OF SEPTIC SYSTEM. — SEPTIC SYSTEM STRUCTURAL COMPONENTS SHALL BE CAPABLE OF WITHS1AdNDING A H-10 LOADING, UNLESS SPECIFIED OTHERWISE — SEPTIC SYSTEM UNDER DRIVEWAYS SHALL COMPLY WITH A H-20 LOADING. — THE DESIGN AND COMPONENTS OF THE SEPTIC SYSTEM SHALL BE IN COMPLIANCE WITH THE STATE OF MASSACHUSETTS SANITARY CODE TITLE V, AND SHALL BE IN COMPLIANCE WITH THE LOCAL BOARD OF HEALTH RULES AND REGULATIONS. — THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION OF ALL UNDERGROUND UTILITIES AND SHALL NOTIFY DIG - SAFE PRIOR TO CONSTRUCTION. — NO GARBAGE GRINDER DESIGN CRITERIA: DESIGN FLOW 4 BEDROOMS AT 110 G.P.B. / DAY 440 G.P.D. REQUIRED SEPTIC TANK: NEW 1.500 GALLON SEPTIC TANK PROVIDED 1,500 GAL DESIGN PERC RATE <2 MIN/INCH SIZE OF REQ'D (SAS) AREA = 440/0.74 = 595 S.F. SIDEWALL 2) 0.83)(45.75)+(2)(0.83)(11)= 94.2 S.F. BOTTOM 11(45.75) = 503.25 S.F. SIZE OF LEACHING FACILITY PROVIDED: 503.25 S.F. + 94.2 S.F. = 597.45 S.F. = 442.1 GPD EFFECTIVE DEPTH: 10" EFFECTIVE LENGTH: 45.75' EFFECTIVE WIDTH: 11.0' UNTER ENGINEERING 7 WEEKS POND DRIVE FORESTDALE, MA (508) 477-8268 PROJECT: SEPTIC SYSTEM REPAIR FOR 259 LONG POND DRIVE wAm AS SHOWN I MAP 59 / LOT 94 MAW fft% JH 0A1- 3/9/02 W. OWNER: ROBERT MAWHINNEY 259 LONG POND DRIVE SOUTH YARMOUTH, MA •