Loading...
HomeMy WebLinkAboutEngineered Plan - 1997BENCHMARK20 FT. MINIMUM FROM CELLAR TOP_ OF FOUNDATION1CLEAN SAND - 0 FT. MINIMUM FROM SLAB OR CRAWL.SPACE 1DQjr' 10 FT. MINIMUM f ELEV = ..�.... '(ASSUMED} CONCRETE LOAM AND SEED. COVERS, 4! SCHEDULE 40 PVC PIPE MIN. PITCH 1/8- PER FT. 2O LAYER OF 1 /8w TO /20 - WASHED .TONE EC f . 83 M Ax EL G , 8 3a+, VENT TTREQUIRED 4" 'CAST IRON PIPE (OR EQUAL) MINIMUM z 1 CU. FT. OF CONCRETE PITCH 1/4 PER FT. - j .g li. ANCHOR !_ 95.8 3 FLOW LINE ELEV. G . �' - w 2 eo54 7M N. 9 G�.:/ � IE•VEL I4 ELEV. _ _ L�`S' 3 GAS m, _-_a , 6' SUMP ELEV. 9_� . ELEV. m--- BAFFLE ELEV �3 ' HIGH C Pr) c / rY DISTRIBUTION LIQUID OUTLET BOX __= .__ X20 INFILTRATORS WITH STONE IN AN DEPTH (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED �.x /C) TRENCH FORMATION z J � ' x ,� F 2 DATE SOIL TEST r `' -� 7- SOIL .TESES T DONE BY t� � WITNESSED BY P n� y _'404/ H 0 Lf gam. �. OBSERVATION HOLE 2 �•a OBSERVATION HOLE 1_--- PERCOLATION RATE MIN./INCH AT S`� INCHES 8<m PERCOLATION RATE MIN./INCH AT INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER yyEi,i„ R 1 �✓ 230 WATER ENCOUNTERED AT I Z �V, _ sand y - 1G7 yle �1$ 24 INCHES E o n J- G TITLE 5 AND THE JOWN OF RULES AND' 4" 7. FEET 8 FEET .. A�� , L L 9 7.93 34 C, rr a - s� 9e--77 ( E5 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO 4-$ �`� Said 4/4 ^r -ll r�=0 USGS PROBABLE WATER TABLE EjLEV. _ _ _ __-- .... _... _...� ,- . ,- i �� i -j,% rt ry - EXISTING SPOT ELEVATION OOxO EXISTING CONTOUR ----00---- NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT N. TOTAL ESTIMATED FLOW - PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS 2•-5_Y 8. PARCEL IS IN FLOOD ZONE C C Z3 9. LOT. IS SHOWN ON ASSESSORS MAP % AS PARCEL -- C3 ,. 7/Z DEPTH HORIZ TEXTURE COLOR MOTT. OTHER QR /_ WATER ENCOUNTERED AT t zv. = FINAL SPOT ELEVATION.0 4 FEET 5 FEET 14 INCHES 19 INCHES 1 rJ00 GALLON IF MORE ONE OUTLET: ,I ABSORPTION yyEi,i„ R 1 �✓ 230 WATER ENCOUNTERED AT I Z �V, _ LEACHING CAPACITY (AREA X RATE) ? GAL/DAY 6 FEET 24 INCHES (TO BE PLACED ON FIRM BASE) SOIL ,' ZONE TITLE 5 AND THE JOWN OF RULES AND' 7. FEET 8 FEET 29 INCHES' 34 INCHES SEPTIC TANK s.7"" It4 co 3/4• TO 1 1/20 WASHED STONE SYSTEM (SAS INDEX �: / - ADJUST o-2 LEGEND: DESIGN CALCULATIONS 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. ( E5 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO SUCH DETERMINATION FROM ,APPROPRIATE AUTHORITY. . __.__.OBTAIN 6. U11UTIES SHOWN ARE APPRO)GMATE ONLY, EXCAVATION CONN -,A ^r -ll r�=0 USGS PROBABLE WATER TABLE EjLEV. _ _ _ __-- .... _... _...� ,- . ,- i �� i -j,% rt ry - EXISTING SPOT ELEVATION OOxO EXISTING CONTOUR ----00---- NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT N. TOTAL ESTIMATED FLOW - FINAL SPOT ELEVATION.0 (/ ra GAL J'BR./DAY X 3 BR.) 33 o GAL/DAY FINAL CONTOUR 00 SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY GAL ACTUAL SIZE OF SEPTIC TANK (. �y� t � 7.,� f �"" GAL UTILITY POLE '0" TOWN WATER —W w W- SOIL CLASSIFICATION r DESIGNCLASSIFICATION PERCOLATION RATE < -I- MIN./N. CATCH BASIN ®� GAS LINE O` EFFLUENT LOADING RATE -? _ GA/DAY/S.F. LEACHING AREA ' / /' x 3'I` t ��n t ? SQ. FT. LEACHING CAPACITY (AREA X RATE) ? GAL/DAY � 449 n .74) "0-1 GAL./DAY RESERVE LEACHING CAPACITY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE JOWN OF RULES AND' REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. . 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO SUCH DETERMINATION FROM ,APPROPRIATE AUTHORITY. . __.__.OBTAIN 6. U11UTIES SHOWN ARE APPRO)GMATE ONLY, EXCAVATION CONN -,A IS TO CALL ODIC -SAFE' AT 1-800-322-4844 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. 8. PARCEL IS IN FLOOD ZONE C C Z3 9. LOT. IS SHOWN ON ASSESSORS MAP % AS PARCEL -- lED JUN 2 4 1997 ? IEA'_ 1 I -I DEPT. v APPROVED: BOARD OF HEALTH -7 DATE AGENT PROPOSED SEPTIC DESIGN FOR 'FRANK C HA "RZA .PROJECT LOCATION A a. -a SOU 7H %p 2Ivi Ly 7",-# CRAIG P, SHORT PROFESSIONAL ENGINEER 508— P. 0. BOX 781 >85-6530 DENNIS, MASS. 0263 -IFDATE SC r REVISED. JOBNO. e LOCATION MAP REWnsED SHEET . j / OF / -_ ehlooa CRAIG R. SHORT. P.E