Loading...
Decision 3795 - Title 5 Site Plan 27 DWELLING TOP FNDN, AT EL. 21.5 SYSTEM PROFILE ACCESS COVER TO WITHIN 6' OF FIN. GRADE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO �� 20.0' MINIMUM 75' OF COVER OVER PRECAST % WITHIN 6' OF FIN. GRADE 2% SLOPE REQUIRED OVER SYSTEM A 19.3± PR7(H- 00 18 0 GATIC TA0 ) MIN ( 2 % SLOPE> >� DEPTH OF FLOW = 4 TEE SIZES; INLET DEPTH = 10" OUTLET DEPTH = 14" DWELL. RUN PIPE LEVEL FOR FIRST 2' 17.75' BAFFLE 1 E., 7� �- 16.54' 6- CRUSHED STONEORMECHANICAL COMPACTION. (15.2EI.(23) (-,L7 SLOPE) ( % SLOPE) FOUNDATION — 21' — SEPTIC TANK 52 COTTAGE FOUNDATION — 18' — (TOP FNDN PROPOSED TO BE AT OR ABOVE EL. 1 :I DOUBLE WASHED PEAS — a o m ED v ED El L� o g 1s.37� LS 2" TOYR 5/2 '1UNICIPAL WATER IS–EXISTING E 3. PIINIMUM PIPE PITCH TO BE 1/8' PER FOOT, o 4. 0000 1OYR 6/2 5. ED OOCDO0 B 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, y' 2' ED ED0ED ENVIRONMENTAL CODE TITLE V. 10YR 7/6 O F-ImL:1ED 24" 39 x 10.83 (.74) = 312 17.4' 3/4' TO 1 1/2' DOUBLE WASH -__D STONE 19' (MAX) BENCH MARK - TOP OF CONCRETE BOUND. ELEV. = 20.4' + 20.3 02-251 COT1 LEACHING FACILITY TEST HOLE LOGS ENGINEER; AH OJALA, PE 19'3' MAX. 5 WITNESS; AMY VON HONE, RS DATE: AUGUST 20, 2002 PERC, RATE _ < 2 MIN/INCH 17.20' CLASS I SOILS P# 1 7.9' 6.47' ELEV. 0. 19.4' 0&A LS 2" TOYR 5/2 '1UNICIPAL WATER IS–EXISTING E 3. PIINIMUM PIPE PITCH TO BE 1/8' PER FOOT, FS 4. 6" 1OYR 6/2 5. PIPE JOINTS TO BE MADE WATERTIGHT. B 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, LS ENVIRONMENTAL CODE TITLE V. 10YR 7/6 7. 24" 39 x 10.83 (.74) = 312 17.4' C PERC FS i 10YR 5/6 74, 0 I Ia IIII LOCUS S„ RTE 28 P �P y OJT I LOCATION MAP NTS ASSESSORS MAP 32 PARCEL 62 ZONING DISTRICT: R25 YARD SETBACKS: FRONT = 30' SIDE = 15' REAR = 20' PLAN REF. - 275/1 FLOOD ZONE; C 138" 1 7.9' NO WATER ENCOUNTERED NOTES: SEPTIC DESIGN:(GaREAG'_ D:SP75ER IS NOT ALLC:.VCJ 1 ')^.'I IM .TSAPPROXIMATEP FR_OM OUAD ^ DESIGN FLOW 4_ BEDROOMS ( 110 GPD) = 440 GPD 2. '1UNICIPAL WATER IS–EXISTING USE A 440 GPD DESIGN FLOW 3. PIINIMUM PIPE PITCH TO BE 1/8' PER FOOT, SEPTIC TANK; 440 GPD ( 2 ) = 880 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10. 1500 5. PIPE JOINTS TO BE MADE WATERTIGHT. USE A GALLON SEPTIC TANK 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, LEACHING_ ENVIRONMENTAL CODE TITLE V. SIDES: 2(39 + 10.83) 2 (.74) = 147 7. 1'H'S PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT 39 x 10.83 (.74) = 312 TO BE USED FOR ANY OTHER PURPOSE. BOTTOM: & °IPE FOR SEPTIC SYSTEM TO SCH, 40-4' PVC. TOTAL: 620 S.F. 459 GPD 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT USE (4) 500 GAL. LEACHING CHAMBERS (ACME OR INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FPOM BOARD OF HEALTH. EQUAL) WITH 3' STONE AT SIDES AND 2.5' AT ENDS 10. PUMP & REMOVE (OR FILL W/CLEAN SAND) EXISTING CESSPOOLS LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR — 100 —EXISTING CONTOUR BOARD OF HEALTH APPROVED off 508-362-4541 fax 508 362-9880 I down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouth, no. 02675 TITLE, 5 SITE PLAN ---- oil 24 WINSLOW GRAY ROAD IN THE TOWN OF: (WEST) YARMOUTH PPEPARED FOR: GINO DeSSANTIS 20 0 20 40 60 MA SCALE: _1" = 20' DATE: SEPTEMBER 26, 2002 ��zT/ Z - DATE