Loading...
App# 4842r TOP OF FOUNDATION l ELEV - /�Q-� 1 t0 FT 4' CAST IRON PIPE PIITCHQ /4') PERIMUFTM 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM FROM SLAB OK CRAWL 5YACL CONCRETE COVERS; 4' SCHEDULE 40 PVC PPI MIN. PITCH 1/8' PER FT. ELEV. U—TMN. ELEV._ AS B GAFT E ELEV. _ (TO BE PLACED ON FIRM BASE) 1500 GALLON SEPTIC TANK J 6' SUMP L-ELEV. _ — DISTRIBUTION ELEV BOX TO BE WATER TESTED IF MORE THAN ONE OUTLET (TO BE PLACED ON FIRM BASE) 3/4' TO 1 1/2' WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE lot• CLEAN SAND ' WATER ENCOUNTERED AT ELEV. + DESIGN CALCULATIONS PROPOSED SEPTIC DESIGN �. FOR /�_ L-7 1... tom. �JV '1.3 �%/�. �C. h�J� ..l"-il.•°. . EXISTING SPOT ELEVATION 00„0 NUMBER OF BEDROOMS qF�JENT T REQUIRED GARBAGE DISPOSAL UNIT NO CU.ONNCHOR TOTAL ESTIMATED FLOW f ( 110 GAL/BR./DAY X SR.) 33D CAL/DAY SOIL TEST LOCATION 1 I e 10'I•l ELEV. _ / HIGH CAPACITY INFILTRATORS WITH STONE IN AN z TRENCH FORMATION M SOIL ABSORPTION SYSTEM (SAS) USGS PROBABLE WATER TABLE ELEV. OBSERVED WATER TABLE ( / / ) ELEV. _ BOTTOM OF TEST HOLE ELEV. _ v I� ^i LAJ " � -� ` �'� 3•] Hid ov'S r — j ,. c� — ! rl r\2 ' I'o v" Y clxla�+o 3311it"LN,:I^ lilt!OiAi>�`;A e-{,� 93ALtidd�l th WELL ZONE INDEX ADJUST SOIL TEST DATE OF SOIL TEST -Nabc 4raEr� .?5. +9SF SOIL TEST DONE BY SWEETSER ENGINEERING WITNESSED BY OBSERVATION HOLE 1 ELEV.= OBSERVATION HOLE 2 PERCOLATION RATE MIN./INCH AT INCHES PERCOLATION RATE MIN.IINCH AT wryacc DEPTH HORIZ TEXTURE COLOR MOTT. OTHER WATER ENCOUNTERED AT ELEV. WATER ENCOUNTERED AT ELEV. + DESIGN CALCULATIONS PROPOSED SEPTIC DESIGN �. FOR /�_ L-7 1... tom. �JV '1.3 �%/�. �C. h�J� ..l"-il.•°. . EXISTING SPOT ELEVATION 00„0 NUMBER OF BEDROOMS EXISTING CONTOUR ---00---- GARBAGE DISPOSAL UNIT NO FINAL SPOT ELEVATION TOTAL ESTIMATED FLOW f WELL ZONE INDEX ADJUST SOIL TEST DATE OF SOIL TEST -Nabc 4raEr� .?5. +9SF SOIL TEST DONE BY SWEETSER ENGINEERING WITNESSED BY OBSERVATION HOLE 1 ELEV.= OBSERVATION HOLE 2 PERCOLATION RATE MIN./INCH AT INCHES PERCOLATION RATE MIN.IINCH AT wryacc DEPTH HORIZ TEXTURE COLOR MOTT. OTHER WATER ENCOUNTERED AT ELEV. WATER ENCOUNTERED AT ELEV. LEGEND: DESIGN CALCULATIONS PROPOSED SEPTIC DESIGN �. FOR /�_ L-7 1... tom. �JV '1.3 �%/�. �C. h�J� ..l"-il.•°. . EXISTING SPOT ELEVATION 00„0 NUMBER OF BEDROOMS EXISTING CONTOUR ---00---- GARBAGE DISPOSAL UNIT NO FINAL SPOT ELEVATION TOTAL ESTIMATED FLOW FINAL CONTOUR-- ( 110 GAL/BR./DAY X SR.) 33D CAL/DAY SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY ew'o GAL UTILITY POLE -6• ACTUAL SIZE OF SEPTIC TANK 1500 'GAL, TOWN WATER —WAY SOIL CLASSIFICATION I CATCH BASIN (J DESIGN PERCOLATION RATE < 5 MIN./IN. EFFLUENT GAS LINE G LOADING RATE 0.74 GAL/DAY/S.F. CLEAN OUT L FACHING AREAS0, F7, CESSPOOL GP.0 LEACHING CAPACITY (AREA X RATE) GAL/DAY LOCATION MAP REVS RESERVE LEACHING CAPACITY GAL/DAY NOTES: I. ALL WORKMANSHIP AND MATERIALS SHALLIrrCONFORM TO D.E.P. TALE 5 AND THE TOWN OF VAJ?IM J# RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6' OF FINISHED GRADE 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE- LACE5. 5.NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. ' 6. UTILMES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'OIG—SAFE' AT 1—OBS-344-7233 AT LEAST 72 HOURS P'rOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE.,ANY,VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE' 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL JJ APPROVED: BOARD OF HEALTH i DATE AGENT 01998 SWEETSER.ENGINEERINGI .; LOCUS •DU[ y. �'k,lt q r 4r ,� tiz,n5 CO PROPOSED SEPTIC DESIGN �. FOR /�_ L-7 1... tom. �JV '1.3 �%/�. �C. h�J� ..l"-il.•°. . PROJECT LOCATION .c7- IA/ lJ1tICz .?itrr-y/,....triAk~ YAP"J>v; H . SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS.. 02660 SCALE y = DATE Job No. C» . . T�REVISE LOCATION MAP REVS SHEET OF - 01998 SWEETSER.ENGINEERINGI .;