Loading...
83-1714 - Site & Sewage Design PlanELEV = -3.35 ELEV = -3.42 B.O.H. VIC D. FLAHERTY D. FLAHERTY 114 DATUM. SOIL iEVALUATOR. SOIL EVALUATOR, Sol ED. STONE ED. STONE BACKHOE OPERATOR. A.B. CANCO soICTYPE: . VERTICAL DATUM: ti DTH #1 INDICATES DEEP Cp 38 TEST HOLE INDICATES ADJ. G. WATER N.G.V.D 28 tojv ST BENCH MARK USI wo MIW-29 OCTOBER 04, INDEX = 9.0 RM -28 ZONE "A" ADJ. +2,2' DESIGN ELEV. 3.49 DTHf1 cc as ON SOI 0 BENCH -MARK SE' "N tu cc WILFIN RD. U.POLE 2 -A LEAST AST ONE ACCESS POINT OVER TANK TEES SHALL BE ACCESSIBLE WITHIN 6", OF FINISH GRADE, WITH ANY REMAINING SPIKE ACCESS PORTS'BROUGHT TO WITHIN 12" OF FINISH GRADE. LOCUS SOUTHI (n OF WITHSTANDING H-20 LOADING UNLESS THEY ARE MORE THAN 10'FROM DRIVES OR PARKING AREAS. THEY MAY THEN BE 67 SHORE SIDE DRIVE THE LOCATION OF ALL, UTILITIES PRIOR TO ANY EXCAVATION. NANTUCKET SOUND 5.'ANY MASONRY UNITS USED TO BRING COVERS TO GRADE OR WITHIN 6*1 OF GRADE SHALL BE MORTARED IN PLACE. 6. FINISH GRADE SHALL HAVE A MINIMUM OF 0.02 FEET PER LOCUS MAP 7. SEPTIC TANK SANITARY TECS SHALL BE CONSTRUCTED OF NOT TO SCALE: SCHEDULE 40 PVC AND SHALL EXTEND A MINIMUM OF 6" D.T.H. fl ABOVE THE FLOW LINE AND SHALL BE ON THE CENTERLINE D.T.H.12, AND LOCATED DIRECTLY UNDER THE CLEAN OUT MANHOLES. DATE: 10/21/04 DATE: 10/21/04 GROUND ELEV 6.65 GROUND ELEV 6.58 PLA ADJ G.W. 3.48 9. THE SEPTIC TANK SHALL HAVE A MINIMUM COVER OF 9 INCHES ADJ. G.W. 3.41 10. THE OUTLET SANITARY <TEE SHALL BE EQUIPPED WITH A GAS O/E/A BAFFLE, 4 INCHES IN DIAMETER AND CONSTRUCTED OF r PVC 31 O/E/A LOAMY SAND LOAMY,SAND (2 BE LEVEL IOYR13/3 IOYR 5/1 12. CHANGES OR REASONS To sEP-nc DESIGN REQUIRE 10YR 3/3 1 OYR 5/1 4(2 NOTIFICATION TO EAS SURVEY INC. FOR B.O.H. AND DESIGN '10"30 LOAMY SAND PER B LOAMY SAND 12 SE 1, CONTRACTORS / INSTALLERS SHALL VERIFY GRADES AND 7.5YR 5/6 ELEVATIONS AND SITE CONDITIONS PRIOR TO COMMENCING 7.5YR 5/6 WORK ON THE SITE. 2'80 0 WITH DEEDED OR ZONING REGULATIONS. OVINER / APPLICANT ELEV 4 0 AUTHORITY. Ir I -3. VEHICULAR TRAFFIC, PARKING OF VEHICLES AND PLACING 38" MATERIALS OVER THE SEPTIC TANK, DISTRIBUTION BOX AND 380 DISTURB S.A.S. AREA IS PROHIBITED. 4. DOWN SPOUTS CONNECTED TO DRYWELLS. 48 WITH A ELEV 2.6 STABALI C . TINE/MED c FINE/MED -SAND 2.5Y 7/4 64" SAND =2* 2.5Y 7/4 64* 5% GRAVEL 120* 120" ELEV = -3.35 ELEV = -3.42 B.O.H. VIC D. FLAHERTY D. FLAHERTY 114 SOIL iEVALUATOR. SOIL EVALUATOR, Sol ED. STONE ED. STONE BACKHOE OPERATOR. A.B. CANCO soICTYPE: . PERC RATE:<2 MIN. PER INCH LOADING RATE.- A-7� GAL/SF/M!N DTH #1 INDICATES DEEP Cp 38 TEST HOLE INDICATES ADJ. G. WATER INDICATES 64" P7-5 4e PERC TEST INDICATES OBS. G. WATER MIW-29 OCTOBER 04, INDEX = 9.0 ZONE "A" ADJ. +2,2' DESIGN ELEV. 3.49 DTHf1 GENERAL NOTES- 1.�=ALL WORKMANSHIP, AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF YARMOUTH RULES AND REGULATIONS FOR SUBSURFACE DISPOSAL OF SEWERAGE. 2 -A LEAST AST ONE ACCESS POINT OVER TANK TEES SHALL BE ACCESSIBLE WITHIN 6", OF FINISH GRADE, WITH ANY REMAINING ACCESS PORTS'BROUGHT TO WITHIN 12" OF FINISH GRADE. 3.. ALL COMPONENTS OF -THE SANITARY SYSTEM -SHALL BE CAPABLE OF WITHSTANDING H-20 LOADING UNLESS THEY ARE MORE THAN 10'FROM DRIVES OR PARKING AREAS. THEY MAY THEN BE H-10 LOADING. 4. ;THE EXCAVATION CONTRACTOR SHALL NOTIFY DIGSAFE AND VERIFY THE LOCATION OF ALL, UTILITIES PRIOR TO ANY EXCAVATION. 5.'ANY MASONRY UNITS USED TO BRING COVERS TO GRADE OR WITHIN 6*1 OF GRADE SHALL BE MORTARED IN PLACE. 6. FINISH GRADE SHALL HAVE A MINIMUM OF 0.02 FEET PER FOOT OVER THE S.A.S. AND DISTRIBUTION BOX. 7. SEPTIC TANK SANITARY TECS SHALL BE CONSTRUCTED OF SCHEDULE 40 PVC AND SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOW LINE AND SHALL BE ON THE CENTERLINE AND LOCATED DIRECTLY UNDER THE CLEAN OUT MANHOLES. 8. THE INLET PIPE INVERT ELEVATION SHALL BE NO LESS THAN 2 INCHES NOR MORE THAN 3 INCHES ABOVE THE INVERT ELEVATION OF THE OUTLET PIPE. 9. THE SEPTIC TANK SHALL HAVE A MINIMUM COVER OF 9 INCHES 10. THE OUTLET SANITARY <TEE SHALL BE EQUIPPED WITH A GAS BAFFLE, 4 INCHES IN DIAMETER AND CONSTRUCTED OF r PVC 11, ALL PIPES SHALL BE SCHEDULE 40 PVC SEWER PIPE AND SHALLBE SLOPED 1/4 INCH PER FOOT MIN. EXCEPT FOR THE FIRST TWO FEET OUT OF THE DISTRIBUTION BOX WHICH SHALL BE LEVEL 12. CHANGES OR REASONS To sEP-nc DESIGN REQUIRE NOTIFICATION TO EAS SURVEY INC. FOR B.O.H. AND DESIGN ENGINEERS REVIEW AND APPROVAL PER CONSTRUCTION NOTES: 1, CONTRACTORS / INSTALLERS SHALL VERIFY GRADES AND R ELEVATIONS AND SITE CONDITIONS PRIOR TO COMMENCING WORK ON THE SITE. 2. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE 0 WITH DEEDED OR ZONING REGULATIONS. OVINER / APPLICANT 'IS TO OBTAIN SUCH DETERMINATION, FROM APPROPRIATE 0 AUTHORITY. Ir I -3. VEHICULAR TRAFFIC, PARKING OF VEHICLES AND PLACING MATERIALS OVER THE SEPTIC TANK, DISTRIBUTION BOX AND S.A.S. AREA IS PROHIBITED. 4. DOWN SPOUTS CONNECTED TO DRYWELLS.