Loading...
BLD-19-002968 .01..y TOWN OF YARMOUTH Building Department BUILDING '0 (508)398-2231 ext.1261 3 ' ,! Q .'...t y PERMIT NO : PERMIT BLD-19.002968 ?c�:� -Sp JOB WEATHER CARD ISSUE DATE :11115/2018 APPLICANT Craig P Bishop i PERMIT TO l Repair AT(LOCATION) 184 FREEBOARD LN,YARMOUTH,MA 02675 1 ZONING DISTRICT 1 I Bldg.Type: 'Residential SUBDIVISION MAP BLOCK LOT 125.73 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Alr Sealing&Weatherization CONTRACTOR LICENSE CS109777 Construction Supervisor (CAPE COD ENERGY SOLUTIONS ILLC AREA(SQ FT) 1455,376,240.1 EST COST($) 3203.70 PERMIT FEE($) 35.00 Craig Bishop __ _ 378 Route 130 OWNER GRANGER PATRICIA.) 1 Sandwich, MA 02563 (_ BUILDING DEP ADDRESS I,84 FREEBOARD LN � J 'YARMOUTH PORT 1MA 102675 1 r _ PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE• MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARr)\/F